Laserfiche WebLink
m m <br />MINUTES OF A PLANNING CCMMISSICN MEETING. HELD AUGUST 16, 1976 - PAGE 3 <br />The Zoning Administrator again reminded the Coimission of <br />the 0?imty's concem of the proposed access to this sub­ <br />division, After some discussion, Hannah moved, Woolley <br />seconded, to grant approval of this subdivision subject to <br />a park dedication fee, approving solely the subdivision as <br />stated, being cognizant of the letter from Donald Muiphy <br />of Hennepin County, and that any conceptual approval or <br />reasonable solution of this condition by the County should <br />come back to the Planning Comnission. Motion - Ayes (5), <br />Nays (0). <br />Member McDonald once again expressed her concem of the <br />heavy amount of traffic that would be driving in and out <br />of Ais mini mart. Mr. Wear stated that traffic was his <br />business. He also told the Planning Comnissicn that he <br />had contacted the State Hi^iway Department, and they did <br />not feel there would be any traffic problem at this <br />location. After some discussion, McDonald moved. Hake <br />seconded, to table this application until the next meeting <br />in order for Mr. Ifear to obtain a written report from the <br />State Highway Department on their view of the traffic <br />situation. The public hearing would be continued to tliat <br />time. Motion - Ayes (5), Nays (0). <br />Councilman Norman Paunjs was in attendance at this meeting <br />to inform the Commission of the action that was taking <br />place on the following items: <br />Gray*s By Dam - Project was started tlire*^ years ago. A <br />control dam near the freeway in Minnetonka had been <br />considered. A major ccaicem was who would control it for <br />the flood in the spring and the drought in the fall. The <br />new dam will be located down stream from existing dam. <br />Tanager Bridro - ^fayor Searles, Dick Benson and Norman <br />Paurus met with the County. Their plans are for a 36' <br />bridge which would consist of two 12 ♦ lanes rnd two 6' <br />bike lanes. The soutlieasterly portion of the bridge <br />would be m the same location. The northwesterly portion <br />of the bridge would be moved somewhat which would cause <br />cutting into the landscape. This would be kept to a <br />minimum. <br />^ng Route - The County would like to get into straighten <br />ing out #110 before tlie City does anything en #19. The <br />County's plans are north on #110, east cm County Road 6 <br />a year or tivo later. The City would support this. <br />ROBERT NIICHEL <br />3175 SIXTH AVENUE N. <br />SUBDIVISICN (PRELMNATOf) <br />IVILLIAM IVEAR <br />2260 WAYZATA BOULEVARD <br />CONDITIONAL USE PERMIT <br />(SERVICE STATION) <br />NORMAN PAURUS <br />GRAY'S BAY DAM <br />TANAGER BRIDGE <br />RING ROJIE <br />i <br />It