My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-02-1976 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1970-1979
>
1976
>
08-02-1976 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2023 3:56:05 PM
Creation date
6/21/2023 3:54:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />MINUTES OF A PLANNING COMMISSION ^CETING HELD JULY 19, 1976 - PAGE 2 <br />Hank Miihich stated that a meeting had been held earlier today <br />at the Village Offices between John Holmquist of the Minnehaha <br />Creek VKatershed District; Rod Hillstrcm, Ryan Construction; <br />Rick Sathre, City Engineer; Dick Benson and Hai^ Muhich. The <br />Minnehaha Creek Watershed District was concerned that the <br />proposed grading and drainage plan could result in higher rate <br />and lower quality runoff than now exists. At this meeting, it <br />was agreed that a french drain system would eliminate this <br />problem. This system would consist of digging 4-5' trenches <br />and adding a layer of 3” rock through the lower area under <br />the surface grating. Quality would be controlled by grading <br />down to a finer material before going into the storm sewer. <br />Rod Hillstrcm and Frank Zelley of I^^an Construction were <br />present at the meeting. They submitted a statement regarding <br />fulfilling M.C.W.D. requironents for the rate and quality of <br />runoff. They will work with this system and submit for <br />approval. Hillstrcm infoimed the Ccmmission that there would <br />be some water retention on the roof, but only for a short <br />period of time. <br />Pesek moved, Guthrie seconded, to approve site plan and <br />elevation based on the stipulation that it satisfies the <br />Minndiaha Creek Watershed District and our city engineer <br />as an adequate filter system. Dunlap suggested that any <br />erosion pi^lems be corrected as they come up. Tlie Zoning <br />Administrator infoimed Ryan Construction and the Conmission <br />that the unpaid sewer and water unit charges assessed against <br />the property would have to be paid before the building peimit <br />is issued. <br />RYAN CONS'. ?WriON <br />(SUPER VALL) <br />3333 SHORELINE WOVE <br />BUILDING ELEVATION <br />6 SITE PLAN APPROVAL <br />i t\ <br />John Lamb in, contractor, and George Hanson were present. <br />Lambin presented the plans to the Conmission for the con <br />struction of a new home. They pleaded hardship to the <br />land because of an approximate 25' drop. There was some <br />discussion regarding moving the street. Dunlap moved, <br />Pesek seconded, to approve this variance subject to <br />changes in the plan whereby the two remaining substandard <br />parcels would be eliminated. Two alternative suggestions <br />were made: <br />^tove location of unplatted street and combine all <br />three parcels, or <br />Grant to the City a conservation easement over the <br />two substandard lots. <br />Motion - Ayes (6), Nays (0). <br />GEORGE HANS(»I <br />BIG ISLAND <br />VARIANCE - LOT AREA, <br />WIDTH § LAKESHORE <br />SETBACKS <br />The Zoning Administrator informed the Commission that <br />because of the cancellation of the July 6tli meeting, he <br />had conducted a telephone poll of the Council and <br />Ccmmission Members to get the necessary approval of <br />this variance. Guthrie moved, Hannah seconded, confirm <br />ing the telephone poll vdiich was taken last week by <br />Hank Muhich and approving the request for variance. <br />MRS. WARD PARTEN <br />1020 TXMCAWA ROAD <br />VARIANCE - LOT WIDTH
The URL can be used to link to this page
Your browser does not support the video tag.