My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-10-2023 Council Packet
Orono
>
City Council
>
2023
>
04-10-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 10:03:43 AM
Creation date
4/17/2023 10:00:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Prepared by: Bolton & Menk, Inc. DOCUMENTATION AND ASSESSMENT PLAN <br />Orono SWPPP ǀ 0C1.126140 Page 2 <br />d) Notices provided to the public of any events scheduled for purposes of providing <br />public opportunity to provide input on the adequacy of the SWPPP, including the <br />Presentation on SWPPP Progress and Implementation and any electronic <br />correspondence (e.g., website, e-mail distribution lists, notices, etc.). <br />e) Date(s), location(s), description of activities, and estimated number of <br />participants at public involvement events that include a pollution prevention or <br />water quality theme. This includes the Park Cleanup Event, Tree Planting Program, <br />Spring Cleanup event, and any other educational or outreach event with a <br />Pollution Prevention or Water Quality theme. <br />3. MCM 3: Illicit Discharge Detection and Elimination <br />a) Date(s) and location(s) of IDDE inspections conducted, including any field notes, <br />maps, pictures, videos, and/or test results. <br />b) Reports of alleged illicit discharges received, including date(s) of the report(s), and <br />any follow-up action(s) taken. <br />c) Date(s) of discovery of all illicit discharges. <br />d) Identification of outfalls, or other areas, where illicit discharges have been <br />discovered. <br />e) Sources (including a description and the responsible party) of illicit discharges (if <br />known). <br />f) Labor, materials, and other costs associated with the investigation for invoicing <br />the responsible party. <br />g) Action(s) taken by the City (i.e correspondence, Notice of Violation), including <br />date(s), to address discovered illicit discharges. <br />h) Enforcement actions, including the following: <br />· Name of the person responsible for violating the terms and <br />conditions of the City’s ordinances. <br />· Date(s) and location(s) of the observed violation(s). <br />· Description of the violation(s). <br />· Corrective action(s) (including completion schedule) issued by the <br />City. <br />· Referrals to other regulatory organizations (if any). <br />· Date(s) and proof violation(s) resolved. <br />4. MCM 4: Construction Site Runoff Control <br />a) Site Plan Reviews, including the following: <br />· Project name. <br />· Location. <br />· Total acreage disturbed. <br />· Owner and Operator of proposed construction activity. <br />· Proof of notification to obtain coverage under the CSW Permit or
The URL can be used to link to this page
Your browser does not support the video tag.