My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-10-2023 Council Packet
Orono
>
City Council
>
2023
>
04-10-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 10:03:43 AM
Creation date
4/17/2023 10:00:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Prepared by: Bolton & Menk, Inc. MCM 6: POND ASSESSMENT PLAN <br />Orono SWPPP ǀ 0C1.126140 Page 2 <br />· Review proximity to surface waters <br />· Review proximity to Impaired waters <br />· Review TMDL requirements <br />· Determine Management Level of Sediment <br />· Rate pond based on following system: <br />Table 1 – Pond Rating System <br />Rating Description <br />1 · Pond completely ineffective <br />· Pollutant removal efficiency reduced well below 50 % NURP / required <br />standards (60% reduction or more) <br />· Efficiency reduced below 50% NURP / required standards (50-60% <br />reduction) and discharges directly to surface water or located in <br />Impaired Water watershed <br />· Maintenance required as soon as possible to prevent further pollutant <br />discharge <br />2 · Pollutant removal efficiency reduced below 50% NURP / required <br />standards (50-60% reduction) but does not discharge directly to <br />surface water and is not located in Impaired Water watershed <br />· Pollutant removal efficiency reduced to approximately 50% NURP / <br />required standards and discharges directly to surface water or located <br />in Impaired Water watershed <br />· Maintenance should be provided as soon as funds are available <br />3 · Pollutant removal efficiency reduced to approximately 50% NURP / <br />required standards <br />· Does not discharge directly to surface water and not located in <br />Impaired Water watershed <br />· Maintenance should be planned for near future <br />4 · Pollutant removal efficiency reduction approaching 50% NURP / <br />required standards (25-50% reduction) <br />· Pond should be checked yearly to monitor permanent pool volume <br />reduction and determine if change in rating is necessary <br />5 · Pond recently constructed or dredged, pollutant removal efficiency at <br />maximum level (0-25% reduction) <br />· Pond should be checked for permanent pool volume capacity starting <br />5 years after initial construction or dredging and every 5 years after <br />until rating decrease is warranted <br /> <br /> Schedule <br />1. Determine Existing Conditions <br />2. Assess TSS and TP Effectiveness
The URL can be used to link to this page
Your browser does not support the video tag.