My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-10-2023 Council Packet
Orono
>
City Council
>
2023
>
04-10-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 10:03:43 AM
Creation date
4/17/2023 10:00:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Prepared by: Bolton & Menk, Inc. MCM 6: POND ASSESSMENT PLAN <br />Orono SWPPP ǀ 0C1.126140 Page 1 <br />VI. MCM 6: POND ASSESSMENT PLAN <br /> Assessment Procedures <br />1. Determine Existing Conditions <br />a) Delineate watersheds for every pond maintained by City. <br />· Review Storm Sewer Map <br />· Review LiDAR topographic mapping <br />· Perform visual inspections <br />b) Define watershed characteristics (impervious surface percentage, time-of- <br />concentrations, areas, soil types, etc.). <br />· Review aerial mapping <br />· Review Land Use Plan <br />· Review Storm Sewer Map <br />· Review LiDAR topographic mapping <br />· Perform visual inspections <br />c) Define pond characteristics (design permanent volume, existing permanent <br />volume, outlet, normal water level, etc.). <br />· Review Construction Plans and Record Plans <br />· Perform visual inspections <br />· Perform site surveys <br />· Perform bathymetric surveys <br />· Perform sediment testing for pollutants <br />2. Assess TSS and TP Treatment Effectiveness <br />a) Create water quality models for every pond maintained by City <br />· Input information gathered into models <br />· Calculate TSS and TP removal efficiencies <br />b) Define TSS and TP treatment effectiveness required for every pond <br />· Establish permanent volumes required to meet NURP standards (60% <br />TSS removal, 62% PP removal, 34% TP removal) <br />· Determine additional reductions required to meet TMDLs, if any <br />· Determine additional reductions required to provide increased water <br />quality benefits <br />c) Rate pond effectiveness / need for maintenance <br />· MN Stormwater Manual recommends sediment removal after 50% <br />of permanent pool capacity has been lost <br />· Compare existing removal efficiencies to required efficiencies
The URL can be used to link to this page
Your browser does not support the video tag.