My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-13-1999 Council Packet
Orono
>
City Council
>
1999
>
09-13-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2023 4:07:39 PM
Creation date
4/13/2023 4:04:26 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8/16/99 2:00 PM Cost Tabulation Sheet City enter actual quantities. <br />Metro Transit Contract No. 98-015-64 <br />with the City of Orono <br />NO.DESCRIPTION QTY.UNIT <br />PRICE <br />♦i <br />TOTALS <br />I <br />1.0 RETROFIT/INSTALL: NEW SIGN ON EXISTING SIGN MOUNTING STRUCTURE. <br />1.1 Retrofit existing sign with new sign.X mm $ <br />1.2 Install new sign on existing structure.11 X =$ <br />1.2.1 Lengthen existing pipe or post X =$ 1 <br />1.3 Install holder.X =$ <br />1.4 Soecial 1.4:i=$ <br />1.0 Sub-:otal i = i$ ~| <br />1 i 1 <br />2.0 REMOVE: EXISTING STRUCTURE WHERE EXISTING BUS SIGN & STOP ARE VACATED/RELOCATED. <br />2.1 Remove and patch, soil/blacktop.X !=i$ <br />2.2 Remove and patch, concrete.!X i=i$ <br />2.0 Sub-total 1 = 1$ <br />t 1 : <br />3.0 INSTALL: NEW SIGN MOUNTING STRUCTURE AND SIGN.1 1 i <br />1 <br />3.1 U-post (concrete).i xi I='$ <br />3.2 U-post (non-concrete).{X' 1=!$ <br />3.3 Round pipe (concrete).i X! i=i$ <br />3.4IRound pipe (non-concrete).1 xl !=•$ <br />13.0 Sub-total i=l$ <br />i 1 ' ! <br />4.0 OTHER.1 i i <br />4.1 Special 4.1: i x i=!$ <br />4.2 Soecial 4.2:xi ='$ <br />4.0 Sub-total =1$ <br />1 i <br />GRAND TOTAi=!$ | <br />! i <br />Agreement (unit prices) PAYMENT OPTION N0.1 <br />1 Agreement (time & material) PAYMENT OPTION NO. 2 I <br />i <br />Approx. % of work done by City's own resources.%I <br />Aoorox. % of work done bv Citv’s sub-contracts.%! <br />Aoorox. % of work done bv City's aqreement with Citv of 1 %l ( <br />!Totals| = i %! : <br />i 1 <br />Recoru of revisions; bv on : bv . on _: by on : bv on <br />KCitv or M.T.): Of : of : of : of <br />Version 1 1 <br />V Checked by Metro Transit Public Facilities Dept, bv Date: <br />1 Date received by Metro Transit <br />V 'Quantities of work Derfbrmed and approx. % of work entered bv Date: <br />Page 1 Interagency Agreement, CnpiuJi EXHIBIT D
The URL can be used to link to this page
Your browser does not support the video tag.