Laserfiche WebLink
8/16/99 2:00 PM PROPOSAL Page1 <br />Metro Transit Contract No. 98-015-64 1 <br />with the City of Orono ; <br />NO.DESCRIPTION <br />Quantity <br />Estimating <br />Factor <br />QTY.UNIT <br />PRICE TOTALS <br />11.0! RETROFIT/INSTALL: NEW SIGN ON EXISTING SIGN MOUNTING STRUCTURE. <br />I 11.11 Retrofit existing sign with new sign. i ! 1 x $20 —20 1 <br />1.2| Install new sign on existing structure.! > 16 X $20 =320! <br />1.2.1 Lengthen existing pipe or post 50% of 1.2! 8i X $20 160 <br />1.3 Install holder.: ! X!$30 =0 <br />'1.4 Soecial 1.4: i I x • i =0 <br />i 1 1.0 Sub-total $500 <br />!! <br />2.0 REMOVE: EXISTING STRUCTURE WHERE EXISTING BUS SIGN & STOP ARE VACATED/RELOCATED. | <br />2.1 Remove and patch, soil/blacktop.50% of 1.1 0! X $20 =1 <br />!2.2 Remove and patch, concrete.50% of 1.1 01 xl $20 =1 <br />1 2.0 Sub-total =$2 <br />1 <br />;i0 INSTALL: NEW SIGN MOUNTING STRUCTURE AND SIGN. <br />3.1 U-post (concrete).12|X $80 =964 <br />3.2 U-post (non-concrete).89 X $70 s 6,2271 <br />13.3!Round pipe (concrete).0 X $100 —01 <br />1 ! 3.4 Round pipe (non-concrete).! 0 X $1201 =Oi <br />1 ! 13.0 Sub-total = ! $7,1901 | <br />------1— <br />1 1 i 1 <br />U.O OTHER.1r~r^Special 4.1: 1 X =0 <br />1 4.2 Soecial 4.2: !X 1=1 01 1 <br />i4.0 Sub-total =$0 <br />1 1 <br />GRAND TOTAL s $7,692 <br />Contingency: 10%NOT TO EXCEED s $8,462 <br />• <br />CHECK HERE TO SELECT (unit prices) PAYMENT OPTION IN0.1 <br />ChlECK HERE TO SELECT (time & material) PAYMENT OPTION [NO. 2 <br />1 1 i <br />Estimated % of work by City's own resources.% <br />Estimated % of work by City's sub-contracts.% <br />lEsKmated % of work bv CitVs aareement wtth Citv of % <br />1 <br />1 1 1 <br />1 <br />Record of revisions: bv on : bv on ; by on : bv on <br />/Citv or MCTOi: of : of : of ; of <br />Date received by MCTO: <br />Version 1 <br />v1 Payment Option and Esdmated % of work entered by Date: <br />11 1 i ‘ i 1 1 <br />Interagency Agreement, Capital EXHIBIT C