My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-19-1999 Planning Packet
Orono
>
Planning Commission
>
1999
>
01-19-1999 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2023 2:49:50 PM
Creation date
3/22/2023 2:43:20 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
J hN-15“199S 16!22 Uestman. Champ 1 in Z Kally 612 334 3312 P.02'03 <br />Ms. Elizabeth A. Van Zomeren <br />City Planner/Zoning Administrator <br />January 15, 1999 <br />Page 2 <br />We are also concerned because our residence is located at the <br />outlet of the cul*de-sac, and because v/e have a three year old <br />toddler and a baby to be born in February. Although we do not <br />intend to allow our children to play on or near the street, we <br />believe increased traffic and increased speed of the traffic on the <br />road is not acceptable. <br />We are also opposed to use of Crystal Creek Road for two <br />additional properties because of financial risks that have yet to <br />be properly considered. First, use of the road during construction <br />and thereafter for the Hilbelink lots v/ill naturally cause wear and <br />tear upon the road, thereby shortening its life and requiring <br />repair or replacement at an earlier time. There also exists a risk <br />that the road will incur sever damage from construction traffic of <br />these lots that will require immediate attention. Liability for <br />this type of damage has not been adequately addressed and it is our <br />fear that such an event will place a financial burden upon the <br />Association and thereby its members in order to repair or replace <br />the road. <br />It was also reported hy Bone.Rtroo Rosene Anderlik St Associates <br />that additional storm sewer and pond capacity may be necessary to <br />accommodate water from the Hilbelink Subdivision. These costs have <br />also not yet been ascertained, therefore we do not know at this <br />time what burden this will place upon the Association. We assume <br />these costs will be paid for by the Hilbelink developers. <br />Nevertheless, even if initial, increased storm sewer and pond <br />capacity was to be paid for by the Hilbelink developers, the <br />Crystal Creek Homeowners Association v;ill probably be liable for <br />any additional costs if further accommodations need to be made. <br />It is our opinion that none of the financial risks have been <br />properly addressed by the Association for these and othei <br />unrecognized consequences of allowing two additional properties to <br />access and use Crystal Creek Road. AC a minimum, additional time <br />is needed by the Association to asses the proposed subdivision and <br />consequences. <br />As you are aware, Crystal Creek Homeowners Association is a <br />new horaeownei's association, but is by no means an active <br />association in view chat only cv/o homeov;ners out of twelve <br />available properties are curi*ently I'esidenc.?. The balance of the <br />properties available in Crystal Creek are owned by developers that <br />have possibly contrary interests to us and future residents of <br />Crystal Creek. In fact, we had our first meeting Januarv' 13, the <br />ourpose of which in part was to discuss this proposal. Hcv;ever,
The URL can be used to link to this page
Your browser does not support the video tag.