My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-21-2002 Planning Packet
Orono
>
Planning Commission
>
2002
>
10-21-2002 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 12:15:12 PM
Creation date
2/22/2023 12:10:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
401
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Dahlstrom Development LLC #02-2789/02-2840 <br />*Stonebay ’ Final Development Plan Review <br />October 18,2002 <br />Page 4 <br />- (Sheet C2.3, North Lane Section) The parallel parking along North Lane is in close <br />proximity to a retaining wall with little space for vehicle driver or passengers to exit the <br />vehicle. These areas should be provided with additional width and/or railings to eliminate <br />this potential conflict. <br />- Handicap accessibility - sidewalk cuts are shown at 12:1 slope, could be flatter (20:1 <br />suggested by Case) - need to review in terms of ADA requirements. <br />- The pond ‘overlook ’ across Kelley Parkway from the main entrance is located and sized to <br />accommodate a future bus shelter. <br />2.Tom Kellogg has provided comments in relation to engineering issues in his letters dated <br />October 1,2002 (Exhibit B-1) and in his comments on the Concept Plan dated May 9,2002. <br />Sheldon Johnson provided his original comments regarding transportation matters in a ’memo <br />dated August 8,2002. Many of the issues ’orought up at the Concept Plan stage have been <br />resolved. A number of issues remain to be addressed. These include: <br />^wsl: Sanitary sewer capacity south ofHighway 12 will be limited until Mn/DOT rebuilds <br />the sewer lines along the New Highway 12 corridor and Orono rebuilds the segment between <br />12 aiid the tracks. Since under Dahlstrom ’s staging plan the first units needing sewer capacity <br />reconstructions are planned to happen <br />in 2003, we believe that capacity will not be exceeded. <br />Per Kellogg s latest letter, plans should show how the commercial Outlets will be served by <br />sewer. Manhole details need to incorporate Infi-Shield exterior sealing system or equivalent. <br />Water: No remaining design issues. <br />Stoi^ Sew^r: The stormwater pond outlet under Highway 12 has been revised as requested <br />to align with the downstream ditch west of the golf dome. A number of requested details <br />have yet to be submitted: 1) Grading plans to show 100-year highwater elevations and <br />proposed emergency overflow elevations and locations for all ponding areas. 2) 2’ of <br />freeboad must be provided between all basement elevations and pond high water levels 3) <br />A drainage area map, storm sewer and ponding calculations must be submitted for review. <br />4) Wetland delineation report must be submitted for review. 5) Need MCWD review and <br />approval of stormwater plan. <br />Site grading : Overall site plan should include an earthworks summary to quantify the <br />proposed cut and fill. Retaining walls over 4’ require an engineered design. Erosion control <br />comments by Bonestroo and Associates are included herein as part of Exhibit B-1.
The URL can be used to link to this page
Your browser does not support the video tag.