My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-08-1979 Planning Packet
Orono
>
Planning Commission
>
1979
>
01-08-1979 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2023 1:38:05 PM
Creation date
2/15/2023 1:37:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
17. This statawnt is not consistent with the 0 (kn|) Plan <br />18. (As above #17) <br />19. This table should be updated to reflect current population projections. <br />20. This statesmt should be updated to reflect 0 present Conp Zoning Plan. <br />21. This statenent refers to Hackberiy Hills which has been sewered and is no longer <br />a problea area. <br />/'22. The servicing of Uds area is not tiie original intent that the interceptors were <br />brought into the4ratershed. The statoMnt should be expanded to reflect the <br />potential deliterious effects .to Lake Mtka caused bv increased urbanization <br />as a result of an interceptor service this area. <br />23. This stateaent should be updated as this project is not in the 1975 capitol <br />iaproveaent prograa.and should also reflect the effects of increased uibanization <br />potentially caused in servicing this area. <br />24. THis stateaent should be up^ted and corrected in light of new population projections <br />by the Metro politan Council. <br />25. THis stateaent is titally incorrect It is diametrically opposed to the intent Of <br />our Goap Land Use Plan. This stateaent further IWiilOKMK is inconsistent with <br />the original intent of the interceptor which was to reaove the effluent frca the <br />sewage treateatn plants in Orono and LL. <br />^ original intent of the interceptor and should <br />27. This vocational school is not planned for the next 20-25 years if ever. <br />28. This stateaent should be expanded to show the effects of poor quality stoia water <br />runoff on lake mtka created frc» excess urbanization caused by the route and design <br />of the proposed interceptor. <br />29. This stateaent should reflect the fact that increased urbanization if not controled <br />,^,fbe watershed of lake mtka can create far more pounds of phosphorus to be <br />liiHwar discharged to lake mtka <hie to the fact Alt poor quality storm water ruioff froa urbanized areas. of <br />30. Stateaent should be updated to include Orono Storm Water Manggenent Plan and the <br />Marsh Identification Half Section Maps prepared in conjimctim with the Soil <br />Conservation Service of the Dept, of lAgricultural. <br />31 Stateaent completely inaccurate past growth of Orono has been at a steady rate <br />of qpproxinately 21 per year. <br />32. Update Luce Line Trail now owned by Dept of Natural Resources <br />33. Stateaent to be expanded to show the iiqportance of the )^ture Conservancy concerning <br />this particular aarsh area, and the long range potential hazards that aay be <br />created by the interceptor effecting this vital area.
The URL can be used to link to this page
Your browser does not support the video tag.