My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-19-1982 Planning Packet
Orono
>
Planning Commission
>
1982
>
04-19-1982 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2023 11:01:09 AM
Creation date
2/15/2023 10:59:24 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4^. <br />41 <br />(.'ll <br />^0 O'" <br />lvili\ir, <br />f fVT rr <br />iiu MiNHioait <br />• "■• <br />P.O. Box 387. Wayzala, Minnesota 55391 <br />■OMO Of HMUaHS; <br />0«v4 H. Cocluan. Pirt. • Alb^tt I lehm«n • l*mn S RjimII • C • B8tb«rt Cu4niiifidM« <br />April 13, 1982 <br />*.t i . ........................... <br />• \\ 11 i I r^N • <br />•• I <br />Ms- Jeanne A. Mabusth <br />Zoning Administrator <br />City of Orono <br />Box 66 <br />Crystal Bay, Minnesota 55323 <br />i <br />- 1 <br />1 ■ <br />■ ?APR I 4 1982 <br />___________ <br />.■ i,; '0 -Oi-i')., <br />♦nt <br />Re: Subdivision Plat rJo. 671, Schlee Builders, Inc. <br />Dear Ms. Mabusth: <br />As per your <br />siibdi vision, <br />prelimi nary <br />problems in <br />consultant . <br />greater deta <br />request for comments concerning the above mentioned <br />the MCWD has had the opportunity to perform a <br />review of the application and has found some potential <br />the runoff calculations prepared by the applicant's <br />Ihese drainage calculations will be reviewed in <br />il prior to any action by the IICWJ. <br />The plat plan indicates the developer will utilize an existing <br />wetland contained within the 4.12 acre park for the purpose of <br />stormwater detention. The wetland is outletted by an existing 15 <br />RCP. The MCWD may require a revision to this outlet to insure <br />that the peak rate of runoff will remain unchanged, and to provide <br />greater water quality necessitated by the development of 48 home <br />sites. <br />Please advise should you need further comments for your April 19 <br />Planning Commission public hearing. <br />Very truly yours. <br />EUGENE A. hICKOK AND ASSOCIATES <br />Engineers for ^e District <br />Cl^l^rd Reep <br />bt <br />H
The URL can be used to link to this page
Your browser does not support the video tag.