My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-21-1976 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1970-1979
>
1976
>
06-21-1976 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 3:48:19 PM
Creation date
2/9/2023 3:46:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
} <br />June 14, 1976 <br />City of OronoProject mooe.o <br />Page 2 <br />Site Drainage: (continued) <br />0 acc(wnK)date runoff from the remainincj areas of the parking lot and from the <br />roof of the building, and to avoid overburdening the Kelley Avenue drainage <br />area, we have designed a holding pond. This pond will be able to hold approximately <br />40,000 cubic feet of runoff or another way of stating it - it will hold all <br />runoff from the site up to an accuimulated sum of 7" of rainfall. We anticipate <br />that with this approach the runoff problems relative to Kelley Avenue, will be <br />less severe than they have been in the past. <br />Watershed District: <br />We have met with Mr. John Holmquist of Minnehaha Creek Watershed District and <br />have rewiewed the above proposed drainage plans with him. Mr. Molniquist stated <br />that he didn't anticipate any problems from the Watershed District with our <br />proposed plans, however, a formal acceptance will be required. <br />If you have any further concerns, please contact us. , * <br />Sincerely, <br />R. J. Hillstrom, P.E. <br />Project Manager <br />RJH:dg <br />Attachment: Drawings <br />cc: Frank Zelley - Ryan Construction <br />'liH
The URL can be used to link to this page
Your browser does not support the video tag.