My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-10-2001 Council Packet
Orono
>
City Council
>
2001
>
12-10-2001 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 3:25:26 PM
Creation date
2/9/2023 3:24:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RIISOLITION IN SUPPORT OF THF WORK OF THE <br />JOINT FIRE STATION CONSTRUCTION COMMITTEE <br />IN THE DESIGN OF THE NEW LONG LAKE FIRE STATION <br />W'HEREAS. the Oruno City Council appointed three representatives to the Joint Fire <br />Station Construction Conunittce to oversee the design and construction of a new Long Lake Fire <br />Station to be located at 340 Willow Drive North; and <br />W HEREAS, the Joint Fire Station Construction Committee, with the assistance of <br />qualified consultants, has been meeting regularly over the post four months with representatives <br />of the Volunteer Fire Department to accomplish its mission of designing and consmicting a <br />quality. cost-elTcctivc. functional fire station that ensures the long-term viability of the Long <br />Lake Volunteer Fire Department and the quality of scr\ ice it provides in meeting the needs of <br />communities that it serves: and <br />W'HEREAS, to accomplish its mission most cost-efTectivcly and to avoid delaying llie <br />construction of new tnmk Highw ay 12. the Joint Fire Station Construction Committee <br />established a schedule to allow for advertising for bids in late February , which is generally the <br />time of year when the best bids are received, and to enable the construction of the new station to <br />be completed by December 2002; ;md <br />W HEREAS, in holding to this schedule, the Joint Fire Station Construction Committee <br />presented a schematic design plan for the new fire station to the City Councils of l.ong Lake. <br />Orono, and Medina in a joint meeting on November 20, 2001 ; and <br />W'HEREAS. the cities of Long Lake, Orono, and Medina approved the schematic design <br />plan lor the construction of a 17,329 square foot fire station at rji estimated cost of S3.545.080. <br />including land acquisition; and <br />W'HEREAS. following the advice of its consultants, the cities authorized four add- <br />alternates (a 6^^ bay, a hose tower, on epoxy floor in the bay area, and space within the lounge <br />area for tlic Department's 1 926 studeboker) to be designed and made a part of he bid package for <br />consideration by the City Councils of Long Lake, Orono, and Medina at the tir.c that bids am <br />received; and <br />Page I of2
The URL can be used to link to this page
Your browser does not support the video tag.