Laserfiche WebLink
minutes of a planning commission meeting held FEBRUARY 6, 1978 - PAGE 3 <br /># <br />(5) An erosion control plan which could include <br />nrulch, temporary straw bale, dikes or other <br />techniques to prevent sediment run-off. <br />The Zoning Administrator also indicated the <br />following information should be submitted prior <br />to approval for the final plat so resolution could <br />be final without any unresolved conditions; <br />(1) Payment of the park dedication fee of $2,000 <br />($1,000 per lot); and <br />(2) Current title opinion addressed to the City <br />approved by the City Attorney; and <br />(3) Payment of one water unit of $580 and two <br />sewer units (to be paid when building permits <br />are issued. <br />Motion - Ayes (6); Nays (0). The motion passed. <br />Chairwoman McDonald announced this was the time and <br />place for a Public Hearing on the petition of <br />Richard Ledstrom for preliminary approval of a <br />subdivision at 3405-6th Avenue North. The Zoning <br />Administrator presented the Notice of Public Hearing <br />and the Affidavit of Publication, <br />He explained that Lot 1 is 13.2 acres with 6.2 <br />dry buildable acres and Lot 2 is 5.7 acres with <br />4.3 dry buildable acres. He referred to the <br />letter from the City Engineer dated February 2, 1978 <br />which stated: <br />1. <br />b. <br />2. <br />a <br />Regarding the access parcel for the two proposed <br />lots (Ledstrom Circle); <br />a. If this access is dedicated as public <br />right-of-way it must be improved to City <br />street construction standards; and <br />If this access is to be private the right- <br />of-way must be identified as an outlet or <br />a separate lot within the plat; and <br />c. If Ledstrom Circle is to be a dedicated <br />right-of-way or a separate parcel, there must <br />be a replatting of Lots 1 and 2, Rocky <br />Knoll because Ledstrom Circle extends over <br />and across these two lots. <br />Evidence be submitted that an adequate soil <br />absorption sewer system can be designed and <br />installed for Lot 2; and <br />The conservation and flowage easement be revised <br />to follow the 973 contour line including the area <br />across Lot 1 near County Road #6 from the wetlands <br />to a culvert under County Road #6 at the northwest <br />corner of the plat. <br />PAUL RASTER <br />#346 <br />(con* t) <br />* <br />-6^’ • V. <br />PUBLIC HEARING-7;45 P <br />RICHARD LEDSTROM <br />3405-6TH AVENUE NORTH <br />SUBDIVISION (PRELIM.) <br />#348