Laserfiche WebLink
StoneBty Fees <br />December 4,2002 <br />Page 4 <br />• •• <br />III. StoriaWater & Drainage Trunk Fee <br />Staff Calculation Based on Ordinance: <br />Multi-Family: 4 or fewer Units/Acre.................... $4,860.00 per acre <br />Multi-Family: Greater than 4 Units/Acre............... $5,670.00 per acre <br />Commercial:.................................................... $6,480.00 per acre <br />*. r, Residential Portion: 41.55 acres @ 6 units/acre = 41.55 x S5.670 $235,600 <br />Commercial Portion: 9.90 acres x $6.480.00/acre = $64,152 <br />Developers Proposal; <br />1. Base the fee on dry buildable acreage only: <br />Residential Portion: 27.72 acres x S5670 = $157,172 <br />Commercial Portion: 8.75 acres x $6480 = $56,700 <br />2. Grant credit of $15,100 plus 12% design cost for oversizing of watermain <br />3. Grant credit of SI 17,160 plus 12% design cost for entire construction cost of regional <br />stormwater pond. <br />4. Grant credit of $17,740 plu' 12% design cost for incremental cost/benefit of <br />providing storm sewer to the properties to the west (2 dental office sites). <br />Total credit or reimbursement proposed by Developer: $168,000 <br />Staff Analysis and Recommendation <br />Again, developers suggest that the fee should be based on dry buildable land acreage. However as <br />noted m the recent staff memo and code amendment regarding the S W«S:DT Fee for 2-acre and 5-a'cre <br />zones, the original ordinance established a fee structure based on the entire acreage of the various <br />zones of the City and did not exclude wetlands from the calculation method. Fee should he h;,.^d <br />on entire acreage. ----- ------------ <br />* <br />Developer is requestingcreditsforS16,9I2for provision of excess capacity in water line^e City <br />^^uired to be 12'' vs 8". This was done with the Willow View project and is a reasonable <br />Developerisrequestingcreditfor$131,219forconstructionoftheregionalpond. StafTwouldnntv <br />SUBP9rt a p^rttjil pry^it, based on the difference between the cost of a pond with capacity needed to <br />serve just the Stonebay and associated commercial development, and the cost of the regional pond <br />Developer would be required to calculate this cost differential and City Engineer would verify. <br />Developer also requests credit for construction of storm sewer facilities constructed to serve the