My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-09-2002 Council Packet
Orono
>
City Council
>
2002
>
12-09-2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2025 12:35:47 PM
Creation date
2/9/2023 9:56:06 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
_A <br />UPDATED FEES ESTIMATE - «^02-2789 Dabbtrom Development-August 2002 <br />This estimate of fees is divided into three categories: <br />l. Base application fees per City Fee Schedule, intended to cover City costs of / <br />processing the application <br />n. . Development fees per City Fee Schedule, related to the costs of providing <br />infr^tructure ^arks, sewer & water system, stormwater management) <br />m. Ancillary administrative costs (based on pass-through legal, engineering and planning <br />consultant costs incurred by the City) <br />I. Application Fees <br />a. Initial application fees <br />Commercial Site Plan Review....................................... $ 250.00 <br />PUD Rezoning ............................................................. 375.00 <br />Comprehensive Plan Amendment................................. 375,00 <br />Sketch Plan Review..................................................... 275.00 <br />SI,275.00 <br />Amount Paid 4/17/02 (Receipt #17664) 1.225.00 <br />Balance Due S 50.00 <br />b. Development application fees <br />Note: Fees in column A are/were due with Concept Plan Application; unpaid fees <br />from column A and fees in column B based on approved numbers of units or footages <br />will be due upon Concept Plan Approval. <br />_A_ ____B_____ <br />PUD / Rezoning : <br />Residential Portion .............................................. S375.00 (pd) plus $40.00 per unit <br />168 units X $40.00 » $6.720 <br />Commercial Portion ............................................ $175.00 /acre <br />(Defer until Outlots are replatted/developed) <br />Preliminary Subdivision Application ..................... $400.00 <br />$400 <br />Special Improvement Fees: <br />-• - Proposed Public Road (Kelley Parkway).............. $950.00 plus-$0r50 per l.f. <br />$950 + (1.950 if X $0.50) » $1,925 .. — <br />- Proposed Private Roads ................................ $650.00 plus $0.50 per l.f. <br />(i.e. private roads that arc not individual driveways) <br />$650 + (3.400 if X $0.50) = $2,350 <br />- Proposed Storm Sewer System........................ $250.00 <br />$250 <br />• Proposed Sanitary Sewer Main Extension.......... $275.00 plus $25.00 per stub <br />(Res. only) $275 + 168 unitsx $23.00 ■ $4,475 <br />• Proposed Water Main Extension..................... $275.00 plus $25.00 per stub <br />(Res. only) $275 + 168 units x $25.00 " $4,475 <br />- Future Commercial Sewer & Water (Same unit rates as residential, total fee dependent on <br />number of units required by future commercial development) <br />Page I of 3 <br />■--------------- -
The URL can be used to link to this page
Your browser does not support the video tag.