Laserfiche WebLink
MchatlGaRm <br />Page 6 of 6 Re: PUD Concept Plan Stage Submittal Requirements <br />______________________ April 17.2002 <br />/7.I/I^n the PUD is to be constructed in stages during a period of time <br />extending beyond a singie (xmstruction season, a schedule for foe <br />development of such stages or units shall be submitted staUng foe <br />approximate beginning and completion date for each such stage or unit and <br />the proportion of the total PUD public or common open ^ce and dwelling <br />units to be provided or constructed during each such stage and overall <br />chronology of development to be followed from stage to stage. <br />In 2004/2005. The Lofts and the commercial portion of the site may be constructed <br />as an^rne. A graphic representation of the proposed staging plan is Included In the <br />submittal package as sheet C5.2. <br />i.When foe proposed PUD includes provisions for public or common open <br />space ^ service facilities, a statement describing the provision that is to be <br />made for the care and maintenance of such open space or service facilities. <br />Landform will prepare development standards that will be Included in the covenants <br />for the property. A draft of those documents will be submitted with the PUD <br />development stage plan and filed with title to the property. The PUD concept stage <br />plan narrative provides a general description of the development plan. <br />k.Schematic utility plans indicaVng placement of water, sanitary and storm <br />sewers. <br />The schematic utility plans are Included In this submittal package on sheet C4.1. <br />• r <br />. - 'O'. ■; <br />I^^VENUE M|||||4a P|650 BUTLER NORTH BUI lOING 510 Flffsf AVE nJe NOmH MllWEAPOLIS.'Bii^5403 <br />OFFICE: 612^2.9070 FAX: 612.252.9077 www.tandfbmuiet <br />t-i. - .« »>»l’i JtWt a !'T »