My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-09-2003 Council Packet
Orono
>
City Council
>
2003
>
06-09-2003 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2023 4:13:58 PM
Creation date
2/8/2023 1:26:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
#03-2889 iUvia Real Estate <br />June 5,2003 <br />Page 6 <br />SUMMARY OF PARKING <br />STANDARDS <br />Orono Code ® S/1000 net <br />ITE Standard @2.79/1000 gross <br />Shelley Johnson (Bonestroo): <br />3.5-4.0 /1000 gross <br />WaUy Case (DSU): <br />3.S-4.0/1000 net @85*/. <br />Ravia Proposal (0-2-03 submittal) <br />Gross " 42,000 s.f. <br />1 17 stalls <br />147-168 stalls <br />Net @ 85% <br />3S.700 s.r. <br />178 s'alls <br />125-143 stalls <br />Net @ S0% <br />21,000 s.f. <br />(105 stalls) <br />installs <br />It should be noted that the Dunbar office plan approved per PUD Agreement 2A did not require a <br />parking variance, had substantial parking underground to reduce the intensity of parking <br />aboveground, and provided for weekend overflow parking for the Senior Housing building. <br />On April 17 MPG visited two similar developments noted by the developer - Fernbrook Town Office Park <br />in Plymouth (west side of Fernbrook Lane 1/4 mile north of Hwy 5S) and Foresiview Town Office Park in <br />Maple Grove (south end of Forestview Lane, 1 block east of Hemlock Lane on south service road of <br />694/Hemlock eiit). Both sites had 2-les‘el office units similar in size to those proposed. Fernbrook has rear <br />walkouts, Forestview has rear lookouts with no lower level eiits. <br />Parking at Fernbrook (7.4 stalls per unit) was less than half full at S:15 p.m. There is no on-street parking <br />available nearby, but it didn’t seem to be a problem. Parking at Foresiview (8.2 stalis per unit) was nearly <br />full at 5:40 p.m. and there was overflow parking occurring on the adjacent street. This site had a parking <br />issue that day, but my subsequent visits found ample parking available during the workday. <br />Staff initially recommended approval of parking at a level no less than 10 stalls per unit, which is <br />about where the current plan sits. The City’s goal should be to provide just enough parking to avoid <br />problems such as overflow parking at the Senior Housing or Orono Shopping Center lots, but not <br />provide excessive hardcover in never-used parking stalls. <br />Based on the above, staff recommends that the minimum parking requirement for this <br />proposed office development be based on 3.5 stalls per 1000 net s.f. of building, using 85% of <br />gross floor area to define net s.f. Reducing the gross square footage to 35,000 s.f. and increasing <br />parking by 10 stalls to 123 stalls total is one way this standard could be met. <br />C. Surface Water Management Plan <br />All roof and parking lot runoff will be collected via catch basins and transported via underground <br />storm sewers to the existing stonn sewer system serving the Senior Housing site, discharging to the <br />existing NURP pond located at the northwest comer of Brown Road North and Highway 12. <br />Capacity and design of this pond were previously deemed acceptable by MnDOT, the Minnehaha
The URL can be used to link to this page
Your browser does not support the video tag.