Laserfiche WebLink
r <br />grade and ihc top of the pipe. <br />^ E should be lowered I-foot to 1006.0 ..id the downstream ditch graded to drain <br />accomplished by addtng a manhole and a pipe section. <br />Strcets^rails: <br />* bu!miJor$ lJail!“'^ constnjctcd as an 8-foot widebituminous trail. <br />A geotechnical report. R-value recommendation and pavement design should be provided for review <br />?Tn u** type 41A bituminous wear course rather'than 2- <br />Most proposed vertical and horizontal alignments shown on the private streets do not meet a 25 mph desien <br />thJ besf JZbTnar ‘’7“^ Jong with a curvilinear horizontal alignment and narrow streets may not L <br />li^ed il for ho ? M *"• determine what the minimum acceptable designSf«ed IS for horizontal and vertical street alignments. The City requires that newly co: -.i: ;• J public streets <br />incct a minimum 30 mph design for both horizontal and vertical alignments. At a minimum suggest softening <br />the vertical grade breaks to meet a 25 mph design. sortening <br />on Bridgewater Drive between the north end of the bridge and the ro-indabout <br />needs to be revised to eliminate the substandard curve shown south of the bridge <br />A non-woven geotextile fabric should be added to the typical street secUons <br />21's fZT 0" Willow Drive should be removed leaving a solid 5-foot by <br />215-foot co.icretc median. The northerly 20-feet of the median should be striped so that southbound traffic on <br />Wi ow cannot enter the left turn lane until they are south of the Otten driveway intersection <br />completely reconstructed (full width) from the south right-of-way of Dickey Lane to the <br />northerly linruls of the proposed southbound right turn lane construction (370-feet +/-) <br />The t^ical street section for Willow Drive should be revised to match the existing section- fabric n- <br />granular. 6" class 5 (1005b crushed lime rock). 3" bituminous base. 2" bituminous binder, and Ibituminous <br />Traffic: <br />“ *“ "■»“ “ “» <br />Plans should include a signing and striping plan. <br />The pedesuian crossings at the roundabout accesses should be located one vehicle length before the yield sign. <br />Site Grading and Erosion Control: <br />!i v” ^ ^ "on-disturbance before temporary stockpiles willneed to be seeded or mulched. We recommend this time limit be 14 days ^ <br />’ ^,I7he ba.r-.nI ‘yp« I. Certification tags should be left <br />presence of *e pror.'l'IX'"' ““ <br />and respo.isibIc for erosion and sediment control onsite, and for any related <br />. Z SE^rTeTtio "*‘8ht arise during the construction of the project <br />p,o.r,rs'trsrrpor“ <br />combination of inlet protection devices and silt fence structures is the recommended practice. ^