Laserfiche WebLink
a. <br />b. <br />c. <br />d. <br />c. <br />f. <br />Obtain projections and reports from MnDOT and Hemiepin County <br />supporting traffic projections for TH 12 Corridor. <br />Obtain Hennepin County travel model and review assumptions and <br />projections in model for the study area. <br />Review land use and trip generation assumptions used to develop projections <br />and determine if these are appropriate. <br />Review transportation network assumptions relative to speeds, capacity, other <br />links in the system and centroid connections to determine if they are <br />appropriate. <br />Where appropriate modify land use. trip generation, and network assumptions <br />to determine the impact on traffic volumes. <br />Develop final set of traffic projections that can be presented to MnDOT and <br />Hennepin County along with assumptions .supporting the projections. These <br />projections will form the basis for the proposed improvements on TH 12. <br />Deliverable: Memorandum documenting recommended traffic forecasts and basis <br />of assumptions for the forecasts. <br />4. Land Use and Aesthetic Improvements Overv iewA'ision <br />The purpose of this task is to verify the validity of existing planning documents and past <br />planning actions. The result of this effort will be the validation or modification of the <br />land use and aesthetic goals that have been identified in the past, particularly as stated in <br />the Long Lake Downtown Master Plan and Redevelopment Guidelines. HKGi will: <br />a. <br />b, <br />c. <br />Review the existing market analysis (Maxfield). Orono and Long Lake <br />Comprehensive Plans, and Long Lake Downtown Master Plan, and Plaiming <br />Commission input. <br />Meet with the Turnback Committee to review directions and confirm baseline <br />planning and design assumptions. <br />Where appropriate, assist the cities in clarifying long-term land use visions for <br />'1H12, particularly between May Street and Old Crystal Bay Road. The land <br />use review will include the identification of property acce.ss options and their <br />impact on resulting land use patterns. The land use/acccss information will be <br />used as an input to Task 5 (c). <br />Assemble a concept plan that examines future land use scenarios and explores <br />varying means of implementing the identified aesthetic goals for the conidor. <br />Create a set of streetscape vignettes that depict varying means of <br />implementing the aesthetic goals for the corridor. The vignettes will focus <br />primarily on the areas that lie outside the curb. They will depict differing <br />levels of improvements along the corridor depending on existing and future <br />land uses. <br />Prepare preliminary cost estimates for the impro\ cments shown in each of the <br />vignettes. Cost information will be generalized (dollars per lineal foot)