Laserfiche WebLink
M>5-3I49 <br />September 19,2005 <br />rage 5 of 7 <br />does not contain any pole lighting nor would the building code require any. Should the <br />iq>plicant wish to construct parking lot lighting in the future, an additional conditional use <br />permit must be reviewed and approved by the Planning Commission and City Council. <br />With regard to building mounted lifting, the applicant has stated only security lighting <br />is proposed, which would be located at entrance locations and the minimal necessary to <br />safely illuminate the sidewalks. There are three entrance points shown on the proposed <br />plan with the main entrance facing Sixth Avenue N and two secondary entrances off the <br />parking lot, which face east. Staff does not anticipate that any building mounted lighting <br />would be near enough to the adjacent residential property to cause any negative impacts. <br />Signage <br />The site contains a monument sign located along Sixth Avenue N and also a symbolic <br />sign on the front facade of the building. No new signage has been proposed as part of <br />this proposal and should any signage be proposed in the future, an additional conditional <br />use permit must be reviewed and approved by the Planning Commission and City <br />Council. <br />Building Height <br />The proposed additions are subject to a 30' height restriction measured from existing <br />grade. The applicant has provided a scaled section drawing indicating compliance with <br />the 30 ’ height limitation with a proposed height of 27*-28 ’. The height impact of the <br />proposed addition is illustrated on the perspective image supplied by the applicant and <br />attached to this report as Exhibit J. <br />Gradiug A Drainage <br />The proposal includes expansion of the parking lot to the northeast and also to the south <br />west. Also included is construction of a rate control pond in the northwest comer of the <br />site. The applicant has provided a Grading, Drainage, and Erosion Control plan, attached <br />as Exhibit E illustrating how the expanded parking and rate control pond will impact the <br />existing topography. <br />As of the date of this report the City Engineer had only reviewed the plans briefly and <br />provided general comments, which were supplied to the applicant in a “Request For <br />Finther Information ” letter sent August 30,2005. Should the City Engineer comments be <br />completed prior to the date of the Planning Commission meeting, those comments will be <br />provided to the applicant and Planning Commission to aid in review of the conditional <br />use permit. If the City Engineer comments are not received prior to the hearing, staff <br />would recommend that the application is tabled until the City Engineer has fully <br />reviewed the plans. <br />Access Locations <br />The site currently has two access points to the site from Sixth Avenue N (or Co. Rd. 6), <br />one approximately 90* east of the westerly site boundary and one at the far east side of <br />the site. These access points will not be altered in any way as part of this project. <br />■•fiaOin