Laserfiche WebLink
"'1 <br />#04-2984 <br />February 17.2004 <br />Page 2 or 0 <br />Lbt of Exhibits <br />Exhibit A- Application <br />Exhibit B- Site Plan <br />Exhibit C - Landscape and Lighting Plan <br />Exhibit D - First Level Floor Plan <br />Exhibit E - Second Level Floor Plan <br />Exhibit F - Building Elevations <br />Exhibit O - Grading, Drainage, Erosion Control, and Utility Plan <br />Exhibit H - Plan/Pit>rile Utility Plan <br />Exhibit I •> Plan of Surrounding Development <br />Exhibit J - Property Owner’s List <br />Exhibit K- Plat Map <br />Background <br />In November of 2002, Professional Properties of Orono, Inc. received approval for the <br />dental ofTice building that exists just to the west of the applicant’s property. During this <br />time the applicant’s property was platted and given an address with the expectation that <br />the site would develop as Phase E(. The applicant’s current proposal is in accordance <br />with those expectations and is proposed as a medical office building to be known as <br />Orono Professional Medical Building IL <br />PUD Designation <br />The PUD, Planned Unit Development designation originated at the sale of the property <br />Just to the west where the dental building is currently under construction. Professional <br />Pn^ities of Orono, Inc., the owners of the dental building bought the property from the <br />City who required that any development of the lot be brought to the City with a PUD <br />designation. This allowed the City to have more control over the development and <br />design of the site. Because the applicant’s property was platted simultaneously with the <br />property to the west it was conditioned that the PUD designation be required at the time <br />of development of this site. <br />LOT ANALYSIS WORSHEET <br />Lot Aroa/Wldth <br />B-d»PUD Lot Area Lot Width <br />Required 20,000 s.f. (2.08 acre)100’ <br />Actual 111,308 s.f. (2.56 acre)376 ’