My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-27-2005 Council Packet
Orono
>
City Council
>
2005
>
06-27-2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 9:48:03 AM
Creation date
1/12/2023 9:14:01 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
■- ) <br />•sr. <br />• *».'•*• <br />1 ' f '. ■ » <br />• * i* < <br />, " 2 . \ * <br />\ <br />} <br />%■m.'W <br />INFORMATION ONLY - NO ACTION REQUIRED <br />To:Mayor and Council <br />Ron Moorse, City Administrator <br />From: <br />Date: <br />Mike Gaf&on, Planning Dircctoi^^j/'^^ <br />May 20,2005 <br />Subject: Stonebay - Final Plat Approval for Final Phases June 13 <br />Attached are the draft Final Plat drawings for Stonebay 3'**, 4‘**, 5"’ and 6"* Additions, which <br />incorporate all the remaining phases of the Stonebay development. Council will recall that the <br />overall plan and layout was approved with the preliminary plat, but only the first phase of 2- <br />story and ramblers in the east half of the site was final platted. The remainder has been divided <br />into four separate additions for final platting now, to allow the developer to move forward. <br />Most of the lots in the first phase have homes under construction or are spoken for. <br />Preliminary staff review indicates that the final plats and the associated plan sets incorporate <br />site plans identical to the layouts approved in the preliminary plat. The four remaining phases <br />are as follows: <br />Stonebay 3”* Addition: 6 units (1 double 2-story TH, 2 double rambler THs) <br />Stonebay A*** Addition: 17 units (4 double ramblers, 3 triple ramblers) <br />Stonebay S'** Addition: 19 units (5 triple 2-story THs, 2 double 2-stories) <br />Stonebay 6"* Addition: 4 units (2 double ramblers) <br />Also attached is the draft design for the small bridge over the wetland just northwest of the <br />central circle drive. The bridge will be precast with a cast stone face look, colored gray to <br />match the granite stonework throughout the site. <br />The final plats will be presented to Council for final approval and resolution adoption on June <br />13. No public hearing or Planning Commission review is required, as the preliminary plat has <br />already been approved, and all plan details submitted appear to conform with the preliminary <br />plat approvals. Home construction within each of these phases will be allowed once the final <br />fees have been paid and plats filed for each phase. <br />This is brought to Council for infoimation purposes only at this time. However, if Council has <br />any questions or issues regarding Stonebay that need discussion or further information, please <br />advise staff as soon as possible to expedite final approvals at the June 13 meeting. <br />Attachments <br />- Steve Johnston transmittal letter dated April 26,2005 <br />- Overall final plat layout and individual final plat drawings <br />- Bridge elevation view and detail <br />• Overall site plan (from preliminary plat stage) <br />5 <br />* r
The URL can be used to link to this page
Your browser does not support the video tag.