My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-27-2005 Council Packet
Orono
>
City Council
>
2005
>
06-27-2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 9:48:03 AM
Creation date
1/12/2023 9:14:01 AM
Metadata
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
laserfiche2
Created:
1/12/2023 9:48 AM
Modified:
1/12/2023 9:48 AM
Text:
http://www.bonestroo.com
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i . <br />i • ^ <br />' I'' <br />i <br />■ • ! <br />li.- <br />Bonestroo <br />sM Rosene <br />Afxlerli(& <br />Associates <br />Engineers & Architects <br />2335 VWest Highway 36 • St. Paul. MN 55113 <br />Office. 651-636-4600 • Fax; 65I-636 I3II <br />www.bonestroo.com <br />June 17.200S <br />Mr. Mike Gaf&on <br />Planning Director <br />CityofOrono <br />Post Office Box 66 <br />Ciystal Bay. MN 5S323 <br />Stonebay Phase II <br />FileNo.000139-0S00(M) <br />Plat No. 02-2789 <br />Dear Mike: <br />We have reviewed die plans and plat dated 3-30-0S for Stonebay development. Phase II. The site is located in <br />the northwest quadrant of the intersection of Willow Drive and T.H. 12. The plans and plat generally conform <br />to the previously approved overall plan set and are generally acceptable. We recommend the following minor <br />revisions to the plans with regards to engineering matters: <br />Sanitary Sewer: <br />• Thesteel 12-inch sanitary sewer casing shown on Sheet C4.0S should be revised to a minimum size of <br />18-inches. <br />Bridge Plaas: <br />• The applicant should conduct a soil investigation to verify the existing conditions, prepare a report of <br />recommendations and coordinate the information with the bridge engineer if this has not already been <br />completed. <br />• The bridge should be d«igned for a live load HS2S if the designers are using AASHTO Standard <br />Specifications 17*^ Edition or HL-93 if AASHTO LRFD Specifications are used. <br />• Final bridge plans should be prepared and sealed by a Professional Engineer licensed in the Suite of <br />Minnesota and those plans submitted to the city for final review and commenL <br />• The plans should include railings on top of the wing walls. <br />Please contact me at (651) 604-4863 if you have any questions regarding this matter. <br />Yours very truly. <br />BONESTROO. ROSENE. ANDERLDC & ASSOCIATES. INC. <br />/O^ <br />Tom Kellogg6^ <br />Cc: GregGappa,CityofOrono <br />St. Paul. St. Cloud, Rochester, MN • Milwaukee, Wl • Chicago. IL <br />Alflnxrth* Ow«#a
The URL can be used to link to this page
Your browser does not support the video tag.