My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-13-2005 Council Packet
Orono
>
City Council
>
2005
>
06-13-2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 9:49:00 AM
Creation date
1/12/2023 9:13:07 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FILE #05-3108 <br />11 May 2005 <br />Page 2 of 4 <br />Lbt of Exhibits <br />A. Application <br />B. Ha^ship Documentation Form <br />C. Existing Survey/Site Plan <br />D. Existing & Proposed Plans and <br />Elevations <br />E. Submitted Hardcover Calculations <br />F. Aerial Photo Overview <br />G. Hardcover Removal Detpil - Site <br />Plan <br />H. Photo <br />I. Property Owner List <br />J. Plat Map <br />Background <br />The applicants have applied for hardcover, lake setback, and side setback variances in <br />order to change the pitch of the roof on their existing garage to match that of their newly <br />renKxieled home. <br />LOT ANALYSIS WORSHEET <br />Loi Arca/Width: <br />LR-IC Lot Area Lot Width <br />Required 21,780 s.f. (O.Sacre)100’ <br />Actual 18,167 s.r. (0.417 acres)SS’ measured parallel w/shore <br />& 7S’ setback <br />Satbacks; <br />LR-IC Required Existiat Proposed <br />Lakeshore (Rear/West)75’Garage 69 ’No Change <br />Rear 30’Garage 58’No Change <br />South Side 10’2.5 ’No Change <br />North Side 10’22.9 ’No Cnange <br />Structural Coverage; <br />Total Lot Area Total Structural Coverage <br />18,167 s.f. (0.417 acres)Allowed: 2,725 s.f. (15%) <br />Proposed: 1.800.25 s.f. (9.9 %) <br />Hardcover Calculations; <br />The applicants recently were granted variances in order to raise the pitch of the roof of <br />the home to allow for a 'A story attic addition. Hardcover removals were required as part <br />of that application and are detailed on the site plan attached as Exhibit G. <br />The hardcover numbers outlined below are consistent with the “before” calculations from <br />the previous application as at the time of this application the required removals had not <br />yet been completed.
The URL can be used to link to this page
Your browser does not support the video tag.