My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-09-2005 Council Packet
Orono
>
City Council
>
2005
>
05-09-2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 9:06:22 AM
Creation date
1/12/2023 8:39:46 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
il <br />;1 <br />Bontstroo <br />Roscne <br />AndcrWcA <br />Associates <br />Owner CityofOrooo.P.O.Box46.Orono.MN SS323 Dale Mav2.200S <br />Contraelon DMJ Cotporalion, 2392 Pioneer Trail. Hamel. MN SS340 <br />Bond Co.: Ueilad Fira end Cisualty Co. OA). PO Box 73909 Cedar Rapids. lA. S2407 Bond No: 54-145242 <br />Contrador <br />AddfOM: <br />MINNESOTA DEPARTMENT OF TRANSPORTATION <br />MINOR EXTRA WORK ORDER NO. 1 <br />LEE CARLSON BALLFIELD TRAIL <br />BRA FILE NO. 000139-03126-0 <br />OMJ Corpofatton W. O. No. 1 <br />S. A P. No. 152-090-012392 PtoneerTnl p, p. nq. <br />Hairat,MN 99340 ContoaciNo. <br />JobLocaton: CR9ftrofflapprex.eSOtaeteastorioapprox. 1387 feet east of OM Crystal Bay Road. <br />Peseripriaii nf Wnrh <br />MINOR EXTRA WORK ORDER NO. 1: <br />I® accofdiBce with Standard Spcclflcatioa 1103 aad 1403, you are hereby authored and instructed to do the work <br />described herein. <br />The fii^ bail alignment and asaociated cuib was located adjacent to the ball paik access road to meet state aid guidelines <br />for honiontal trail alignments and also to eliminate wetland impacts The final trail/cuib construction has resulted in an <br />erosion problem in the gravel roadway adjacent to the ctub. After reviewing topognq>hy and drainage, the Pngint.^ has <br />determined that it is in the City's best interest to install a paved surfiice on the ballparic road. <br />The Conbaebw will pave the ballpark road fiom station OKX) to sUtionS-t-SO and as directed by the Engineer. <br />The existing aggregate base is ad^uate and only reqiured shaping and compacting. The bituminous section shall consist of <br />2” of type 31 Base and 1 1/2* of Type 41 Wear. Payment shall be at foe unit prices shown below: <br />Item <br />1 <br />2 <br />3 <br />CHAWS <»DBR NO. 2 <br />SUBORADB FRBPAltATION <br />BCTUMINOUS WEAR COURSE, TYTO 41 <br />TYTOSl BITUMINOUS BASE COURSE <br />TOTAL CHANGE ORDER NO. 2: <br />Unit <br />contract <br />Qnaatity <br />VmH <br />Price <br />Total <br />RDSTA S233J9 $2,000.82 <br />TN 200 S4SJS $9,110.00 <br />TN 250 S43J3 $IUS7J0 <br />S22.49SJ2 <br />Recommended for Approval by: <br />BONESTROO, ROraME, ANDBRUK ASSOCIATES, INC. <br />DaU: <br />Approved by Owner <br />CITY OF ORONO <br />ASSISTANT DISTRICT ENGINEER <br />Decs <br />S2JJH.lt <br />ec: Ommt <br />Bondiog Company <br />iJ
The URL can be used to link to this page
Your browser does not support the video tag.