Laserfiche WebLink
h- <br />• *: •. *. • <br />• .«•.. <br />.«.»• * <br />• • •• <br />» ••.'Vi / <br />. • • ’ <br />V* .*• <br />.1 • • <br />'•/*** <br />. :’ i V- <br />/ • <br />•1- <br />V J <br />• • <br />t <br />•*.•• <br />• • <br />''y <br />••• <br />* t r-i <br />* • • <br />. •-* <br />■# • <br />* •}' •*' i <br />r #'• <br />. K« <br />*» <br />• •-*. <br />. *i *• <br />I. / <br />^ 4 <br />• IS • <br />•t; <br />'.U <br />. V <br />Sf • <br />1'- <br />• » 4 ‘• • • <br />• 4 • <br />• ,■••• •in*.*./ <br />*" V.• * • :V*; <br />*. aV <br />•i'V.;. <br />• . •/> • . <br />:V. . <br />. r*t.* <br />•.•i. <br />• • •I • <br />t <br />subparc 3. The tequirerser.^s oc succar's . := -i acp-y :c i-.r.ers <br />and operators of demolition deoris iand^disposal .acixi.ies <br />required to obtain a permit under part' /CO-.3050. <br />^ Subo. 2. Location standards for permit-by-rule facilities, <br />^molitibn debris land disposal facilities ?err.itted-o'/-ru*e <br />must .fioc be locaced: <br />A. on a site with Jcarst features including sinkholes, <br />disappearing streams, and caves; <br />B. within wetland areas; <br />C. within a floodplain area; <br />0. within a shoreland area; and <br />E. with a 'water table 'within five feet of the iowesc <br />fill elevation. <br />Subp. 3. Design requirements for perait-^^^ <br />^olUiS; d;'«ris land dLposal facilities permitted-by-rule <br />must be designed in the following manner: <br />A. Site preparation must allow for orderly <br />development of t.he site. Initial site preparations must include <br />clearing and gruobing, topsoil stripping and stockpiling, ..11 <br />excavation. If appropriate, drainage control structures, and <br />other design features necessary to construct and operate the <br />facility. <br />B. The site must be developed in phases to achieve <br />final fill elevations as rapidly as possible. The design of <br />each phase must take into account weather conditions, site <br />drainage, and the waste flow pattern into the site. <br />C. Surface water drainage must be diverted around and <br />away from the fill areas. <br />0. Slopes and drainageways must be designed to <br />prevent erosion. Slopes longer than 200 feet must be <br />interrupted with drainageways. <br />y <br />E. Final slopes for the fill area must be a minimum <br />t'wo percent and a maximum 20 percent. <br />- F. Final cover must consist of at least <br />soil with the top 12 inches capable of sustaining vegetative <br />growth. <br />G. Final contours must be consistent with the planned <br />ultimate -we cot the site. <br />A. The waste must be spread and compacted to the <br />extent possible. <br />site. <br />filling. <br />B. <br />C. <br />The waste must be coveted at least monthly. <br />Suitable cover material must be maintained at the <br />0.Each phase must be staked for proper grading and <br />148 <br />mm <br />■ * <br />• <br />V- <br />. . <br />\\^4 <br />M:•Ji* <br />i’.:' <br />. •• <br />I , <br />m <br />$ <br />• • <br />• • <br />i <br />•• ■ <br />• • <br />... • <br />. • <br />• • • • <br />.V • • • <br />♦ • <br />« • <br />•••* . . <br />• 4 . • . <br />• •. <br />■ * . <br />•*, • 4 • <br />• • • *• s; <br />V 4 f • <br />4.. : <br />.v: ' <br />V •/ . • <br />(I <br />• • <br />.** • <br />4* ' • <br />». <br />4 *•“.. . <br />.;=v <br />.* <br />• • .4 <br />A <br />4^, <br />MMlmtmitn Tft iTlIri i