My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-15-1990 Planning Packet
Orono
>
Planning Commission
>
1990
>
10-15-1990 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2022 10:53:37 AM
Creation date
12/1/2022 10:41:42 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(a) Regular Route Scrv’ice Needs <br />Transit needs for the City of Orono arc detailed in the attached TSNA Subarea Analysis, <br />Generally, this includes implementation of the 1-394 timed-transfer recommendations. <br />(b) Ridesharing and Travel Demand Management (TDM) Needs <br />Communities, employers and developers should play a greater role in promoting <br />ridesharing and creating a favorable environment for iL <br />(c) Transit Facility Needs <br />The City’s plan should include uansit stops and shelters at major activity centers and new <br />developments. In new developments, passenger waiting areas, bus pull-ins and bus turn <br />arounds should be considered. Additionally, sidewalks should be placed along major <br />routes to encourage bus usage. <br />(d) Elderly and Disabled Service Needs <br />The City of Orono should work with the Regional Transit Board and providers within the <br />city in plaiming elderly and disabled services. <br />(e) Light Rail Transit Service .Needs <br />The City of Orono should coordinate with the Hennepin County Regional Railroad <br />Authority (HCRRAi on the development of an LRT plan for the county. <br />4. Implementing Transit Services and Facilities <br />The Regional Transit Board can provide technical assistance in examining or implementing <br />these identified services and facilities. City staff must be actively involved in this process of <br />evaluation, implementation and monitoring. For assistance in preparing the transit element or <br />your comprehensive plan, contact RTB Planning staff at 292-8789.
The URL can be used to link to this page
Your browser does not support the video tag.