My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Development contract
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
75 Bayside Trail - 06-117-23-22-0030
>
Land Use
>
Development contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:28 PM
Creation date
9/1/2015 12:37:36 PM
Metadata
Fields
Template:
x Address Old
House Number
75
Street Name
Bayside
Street Type
Trail
Address
75 Bayside Tr
Document Type
Land Use
PIN
0611723220030
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shall follow all instructions received from the City's ins ectors. The Developer's engineer shall <br /> provide for on-site project management. The Develo er's engineer is responsible for design <br /> changes and contract administration between the Develo er and the Developer's contractor. The <br /> Developer or its engineer shall schedule a pre-constructi n meeting at a mutually agreeable time <br /> at the City Council chambers with all parties concerne , including the City staff, to review the <br /> program for the construction work. Within thirty ( 0) days after the completion of the <br /> Improvements and before the "security" is released, the Developer shall supply the City with a <br /> complete set of reproducible "as constructed" Plans, and an electronic file of the "as constructed" <br /> Plans in an auto CAD file based upon the Hennepin C unty coordinate system, all prepared in <br /> accordance with City standards. Developer will install y required sidewalks and trails just prior <br /> to the installation of the final lift of asphalt. <br /> 9. IRON MONUMENTS. In accordance with Minnesota Statutes Section 505.02 <br /> and the Orono City Code, the final placement of iron monuments for all lot corners must be <br /> completed before the "security" is released. The Dev loper's surveyor shall submit a written <br /> notice to the City certifying that the monuments have be n installed. <br /> 10. PERMITS. The Developer shall btain or require its contractors and <br /> subcontractors to obtain all necessary permits, includi g but not limited to the following to the <br /> extent required: <br /> • Hennepin County for County R ad Access and Wark in County Rights- <br /> of-Way <br /> • DNR for Dewatering <br /> • City of Orono for Building Perm ts <br /> • Minnehaha Creek Watershed istrict for erosion control permit and <br /> storm water management permit <br /> • NPDES Permits (National Pol utant Discharge Elimination Systems) <br /> issued by MPCA <br /> 4 <br /> 169371v5 <br /> �I <br />
The URL can be used to link to this page
Your browser does not support the video tag.