My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Development contract
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
75 Bayside Trail - 06-117-23-22-0030
>
Land Use
>
Development contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:28 PM
Creation date
9/1/2015 12:37:36 PM
Metadata
Fields
Template:
x Address Old
House Number
75
Street Name
Bayside
Street Type
Trail
Address
75 Bayside Tr
Document Type
Land Use
PIN
0611723220030
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11. DEWATERING. Due to the varia e nature of groundwater levels and <br /> stormwater flows, it will be the Developer's d the Developer's contractors' and <br /> subcontractors' responsibility to satisfy themselves wit regard to the elevation of groundwater <br /> in the area and the level of effort needed to perfo dewatering and storm flow routing <br /> operations. All dewatering shall be in accordance with all applicable county, state, and federal <br /> rules and regulations. DNR regulations regarding app opriations permits shall also be strictly <br /> followed. <br /> 12. TIME OF PERFORMANCE. The De eloper shall install all Improvements as <br /> contemplated by Section 8 and the approved Plans by N vember 30, 2013, with the exception of <br /> the final wear course of asphalt on streets. The final ear course on streets shall be installed <br /> between August 15th and September 15th the first summ r after the base layer of asphalt has been <br /> in place one freeze thaw cycle. The Developer may, ho ever, request an extension of time from <br /> the City. If an extension is granted, it shall be condition d upon updating the "security" to reflect <br /> cost increases and the extended completion date. Fina wear course placement must have the <br /> written approval of the City Engineer, and may be dela ed or scheduled at any time of the year <br /> based upon existing site conditions at the discretion of th City Engineer. <br /> 13. LICENSE. The Developer hereby grant the City, its agents, employees, officers <br /> and contractors a license to enter the Land to per rm all work and inspections deemed <br /> appropriate by the City in conjunction with development of the Land. <br /> 14. EROSION CONTROL. Prior to initiat' g site grading,the storm water pollution <br /> prevention plan, and the erosion control plan, Plan B, sh 11 be implemented by the Developer and <br /> inspected and approved by the City. The City may impo e additional erosion control requirements <br /> if reasonably required. All areas disturbed by excav tion and backfilling operations shall be <br /> 169371v5 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.