Laserfiche WebLink
�IAUG❑ Haugo GeoTechnical Services BORING NUMBER HAP-�J <br /> � 2825 Cedar Avenue S PAGE 1 OF 1 <br /> Minneapolis, MN 55407 <br /> CLIENT Gonyea Homes ______ _ PROJE T NAME 75 Bayside Trail __ <br /> PROJECT NUMBER 14-681 PROJE T LOCATION Orono,Minnesota <br /> DATE STARTED 9/11/14 COMPLETED 9/11/14 GROUN ELEVATION HOLE SIZE _3_inches <br /> DRILLING CONTRACTOR HGTS GROUN WATER LEVELS: <br /> DRILLING METHOD Hand Auqer Probe A TIME OF DRILLING —Not Encountered <br /> LOGGED BY DH CHECKED BY A END OF DRILLING --Not Encountered __ <br /> NOTES From Bottom of Wall#2 A ER DRILLING --Not Encountered <br /> w <br /> �� U <br /> S <br /> ~" w C0 v a p MA ERIAL DESCRIPTION <br /> w� a� ui �� <br /> � Q Z � c9 <br /> N <br /> 0.0 <br /> _ (OL)Organic Clay,dark brown to black,wet,s .(FILL) <br /> AU <br /> AU <br /> � AU <br /> J <br /> � - OL _ <br /> � — <br /> o AU = <br /> � <br /> a <br /> m AU — <br /> � 2.5 <br /> � — <br /> �o — <br /> � AU — <br /> � — 3.0 <br /> W Bott m of borehole at 3.0 feet. <br /> 0 <br /> � <br /> a <br /> F <br /> z <br /> � <br /> � <br /> w <br /> J <br /> F <br /> Z <br /> W <br /> m <br /> N <br /> H <br /> Z <br /> W <br /> � <br /> � <br /> U <br /> O <br /> 0 <br /> U <br /> � <br /> m <br /> 7 <br /> a <br /> � <br /> � <br /> w <br /> N <br /> � <br /> U <br /> e <br /> 0 <br /> ro <br /> 0 <br /> v <br /> N <br /> N <br /> m <br /> H <br /> � <br /> (� <br /> m <br /> 5 <br /> � <br /> � <br /> 0 <br /> � <br /> � <br /> � <br /> Z <br /> � <br /> J <br /> W <br /> 3 <br /> a <br /> � <br /> x <br /> m <br /> J <br /> � <br /> W <br /> Z <br /> W <br /> � <br />