Laserfiche WebLink
BORING NUMBER HAP-6 <br /> A- GO Haugo GeoTechnical Services PAGE 1 OF 1 <br /> 2825 Cedar Avenue S <br /> Minneapolis, MN 55407 <br /> CLIENT Gonyea Homes _ _ PROJE T NAME 75 Bayside Trail <br /> PROJECT NUMBER 14-681 PROJE T LOCATION Orono,Minnesota ____ <br /> DATE STARTED 9/11/14 COMPLETED 9/11/14 GROUN ELEVATION HOLE SIZE 3 inches___ __ <br /> DRILLING CONTRACTOR HGTS GROUN WATER LEVELS: <br /> DRILLING METHOD Hand Auqer Probe A TIME OF DRILLING _-_Not Encountered __ <br /> LOGGED BY DH CHECKED BY A END OF DRILLING --Not Encountered <br /> NOTES From Bottom of Wall#2 A ER DRILLING --Not Encountered <br /> w <br /> _ �� � U <br /> w <br /> a x J� v �p MA ERIAL DESCRIPTION <br /> wo�- a� vi qQ� <br /> ¢Z � c� <br /> � <br /> 0.0 <br /> (OL)Organic Clay,dark brown to black,wet,s . (FILL) <br /> AU <br /> AU <br /> � ' AU <br /> J — <br /> � OL <br /> � <br /> o AU <br /> N <br /> } -- — <br /> Q <br /> m AU <br /> � 2.5 — <br /> � -- <br /> �o — <br /> ' AU — <br /> � — 3.0 <br /> w Bott m of borehole at 3.0 feet. <br /> 0 <br /> � <br /> a <br /> G <br /> z <br /> c� <br /> i <br /> w <br /> J <br /> F <br /> Z <br /> W <br /> m <br /> N <br /> F- <br /> Z <br /> W <br /> � <br /> � <br /> U <br /> O <br /> 0 <br /> U <br /> m <br /> � <br /> a <br /> � <br /> � <br /> w <br /> N <br /> � <br /> U <br /> v <br /> 0 <br /> � <br /> 0 <br /> c <br /> N <br /> N <br /> � <br /> H <br /> � <br /> � <br /> m <br /> Q <br /> J <br /> N <br /> 7 <br /> � <br /> F <br /> N <br /> F <br /> Z <br /> � <br /> J <br /> W <br /> 3 <br /> a <br /> � <br /> x <br /> m <br /> J <br /> � <br /> W <br /> Z <br /> W <br /> (� <br />