Laserfiche WebLink
BORING NUMBER HAP-4 <br /> AUG❑ Haugo GeoTechnical Services PAGE 1 OF 1 <br /> 2825 Cedar Avenue S <br /> Minneapolis,MN 55407 <br /> CLIENT Gonyea Homes PROJE T NAME 75 Bayside Trail <br /> PROJECT NUMBER 14-681 PROJE T LOCATION Orono,Minnesota ____ <br /> DATE STARTED 9/11/14 COMPLETED 9/11N4 GROUN ELEVATION __ HOLE SIZE 3 inches <br /> DRILLING CONTRACTOR HGTS GROUN WATER LEVELS: <br /> DRILLING METHOD Hand Auqer Probe A TIME OF DRILLING —Not Encountered <br /> LOGGED BY DH CHECKED BY A END OF DRILLING --Not Encountered <br /> NOTES From Top of Wall#2 __ A ER DRILLING --Not Encountered <br /> w <br /> �� U <br /> w v J� Q p MATE IAL DESCRIPTION <br /> � Qz � <br /> � <br /> 0.0 <br /> Lean Clay,slightly organic,dark brown,soft to mediu .(FILL) <br /> ' AU <br /> ' AU <br /> � AU <br /> J <br /> � <br /> F <br /> o AU <br /> � <br /> > — <br /> a <br /> °�,° i AU <br /> � 2.5 <br /> �o <br /> � <br /> � AU <br /> � <br /> U <br /> w I <br /> � AU <br /> G <br /> z <br /> � AU <br /> J <br /> Z <br /> m AU <br /> � <br /> � <br /> z <br /> � ' AU <br /> � 5.0 5.0 <br /> o Bottom of borehole at 5.0 feet. <br /> U <br /> J <br /> m <br /> � <br /> a <br /> � <br /> K <br /> w <br /> � <br /> � <br /> U <br /> v <br /> 0 <br /> co <br /> 0 <br /> v <br /> N <br /> N <br /> m <br /> r <br /> 0 <br /> c� <br /> m <br /> a <br /> J <br /> � <br /> � <br /> � <br /> H <br /> � <br /> H <br /> Z <br /> � <br /> J <br /> J <br /> W <br /> 3 <br /> a <br /> � <br /> x <br /> m <br /> J <br /> � <br /> w <br /> Z <br /> W <br /> � <br />