Laserfiche WebLink
Prepared By: Reviewed By: A. Carlson Approved By: <br /> <br />b. Engineering and Design Cost. Bolton and Menk prepared the following not to exceed <br />proposals. The proposals are included as exhibits A-__. <br />Project <br /># <br />Project Description Exhibit Proposal <br />(Not to Exceed) <br />22-014 Sanitary Sewer Rehabilitation (CIPP and Manhole Sealing) A $15,000 <br />22-021 Forcemain Replacements Tonkawa PH3&4 B $39,500 <br />22-023 Watermain Replacement along County Road 19 south of 15. C $59,500 <br />22-028 North Shore Drive Ravine Stabilization D $ 11,500 <br />22-029 SWPPP Update E $ 20,200 <br /> 5. Staff Recommendation. I recommend approval of the proposals from Bolton and Menk and that <br />Council authorize staff to begin design and planning for these projects. <br /> <br />COUNCIL ACTION REQUESTED: <br />Motion to direct the City Engineer to move forward with planning for the 2022 Capital Improvement <br />Project listed and acceptance of the Bolton and Menk’s proposal for design and engineering of the same. <br /> <br />Exhibits <br />A. Bolton and Menk Proposal- Sanitary Sewer Rehabilitation (CIPP) <br />B. Bolton and Menk Proposal- Forcemain Replacement- Tonkawa PH3&4 <br />C. Bolton and Menk Proposal- Watermain Replacement- Along CSAH 19 South of 15 <br />D. Bolton and Menk Proposal- North Shore Drive Ravine Stabilization <br />E. Bolton and Menk Proposal- SWPPP Update <br /> <br />