My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-08-2021 Council Packet
Orono
>
City Council
>
2021
>
03-08-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2022 10:40:34 AM
Creation date
1/14/2022 10:23:36 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
490
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Adam Edwards <br />March 5, 2021 <br />Page 3 <br />G:\.Clients All\Orono\Proposals\2021 Public Works Facility Sewer and Water Design\20210305 AEdwards PROP utility extension to PW facility Final.docx <br />AET Phase I Environmental Site Assessment obtained from council meeting minutes <br />revealed no evidence of recognized environmental conditions in connection with the <br />Public Works site. MPCA What’s In My Neighborhood review is also clear of potential <br />contamination sites within or adjacent to the project work area. Therefore, we do not <br />anticipate any additional environmental review will be required to complete the work <br />outlined in the RFP. We also do not anticipate the project requiring a NPDES permit due <br />to the area disturbance projected to be less than an acre. <br />This scope of work does not include any necessary permit fees; these will be passed on <br />to the City if applicable. <br />Deliverables: Permits from MCWD, MDH, and MPCA that are necessary to proceed with <br />construction of the project. <br />Task G: Final Design Documents <br />Plans and specifications for the extension of municipal sanitary sewer and watermain <br />from the existing stubs located at the west end of Goldenrod Way to the future Public <br />Works Facility will be prepared. WSB has many great construction industry partnerships <br />and will coordinate an expert on trenchless technology will perform a QA/QC review of <br />the 60% construction plans. <br />Utility Designs will confirm with BNSF Utility Accommodation Policy, MnDOT Utility <br />accommodation and coordination manual. <br />Deliverables: 60%, 90%, and final construction plans, including a statement of quantities <br />table; an opinion of probable costs based on the final design; project technical <br />specifications; and contract documents. <br />Task H: Bidding Process Assistance <br />Upon City Council authorization, WSB will submit the advertisement for bids, respond to <br />plan holders’ inquiries, tabulate the bids, and provide a letter of recommendation for the <br />City Council’s consideration for award of contract. WSB is able to administer online or <br />paper bidding based on City preference. <br />Deliverables: Advertisement for bids, bid tabulation, letter of recommendation. <br />BASIS OF COMPENSATION <br />WSB’s fee to perform the scope of services outlined above on an hourly, not to exceed basis is <br />$28,736. Hourly Our fee breakdown spreadsheet is attached for your reference. <br />Should additional work arise WSB will contact the City for authorization for additional fee prior to <br />completing any out-of-scope work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.