<br />H:\ORNO\C13115486\z-LA18-000036_2745 Kelley Parkway\2745KelleyPkwy-2_2020-01-23.docx <br /> <br />January 23, 2020 <br /> <br />City of Orono <br />Attn: Adam Edwards <br />2750 Kelley Parkway <br />Orono, MN 55356 <br /> <br />RE: Site Plan Application #LA18-000036 <br /> 2745 Kelley Parkway <br /> Engineering Review #2 <br /> <br />Dear Adam: <br /> <br />As requested, we have completed an engineering review of the documents submitted for the above <br />referenced project. We offer the following observations, comments, and recommendations for your <br />consideration: <br /> <br />Items to be completed prior to Approval <br /> <br />1. The Final Stormwater Management Plan, approved by MCWD, must be submitted to the City <br />for their records. <br />2. Drainage and Utility Easements must be provided to adequately cover utilities as follows. <br />Exhibits and descriptions should be submitted for review, and after City approval, easements <br />should be recorded with the County. <br />a. Watermain, hydrants, and valves (except private service lines) <br />b. Stormwater management facilities used to meet governmental requirements <br />3. A 10’ trail easement must be provided adjacent to the south lot line. Exhibit and description <br />should be submitted for review, and after City approval, easement should be recorded with the <br />County. <br /> <br />Items to be completed prior to Construction <br /> <br />4. A separate City permit must be obtained for the sanitary sewer and water connections. <br />5. The condition of the regional pond east of the site must be reviewed by the City and Contractor <br />prior to any work. The pond bottom must be verified with survey prior to any work, and once <br />work commences, the Contractor shall be responsible for removing any sediment added to the <br />pond due to site construction. <br />6. The condition of Kelley Parkway and adjacent sidewalk must be reviewed by the City and <br />Contractor prior to any work and verified with video or pictures. Any damage to the street or <br />sidewalk after work commences shall be deemed to be caused by the Contractor and the <br />Owner’s responsibility to repair. <br />7. All work within public right-of-way and connections to watermain must be coordinated with <br />the City. Contractor must provide a minimum 48 hour prior notice. <br />8. All construction equipment must be parked on site. Clear drive lanes must be maintained on <br />Kelley Parkway at all times. <br />9. Temporary barricades must be installed at the west entrances to direct traffic through the rock