My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-13-2020 Council Packet
Orono
>
City Council
>
2020
>
04-13-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 10:39:01 AM
Creation date
1/13/2022 10:28:56 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Site Plan Application #LA18-000036 <br />2745 Kelley Parkway <br />Page 2 <br /> <br />H:\ORNO\C13115486\z-LA18-000036_2745 Kelley Parkway\2745KelleyPkwy-2_2020-01-23.docx <br /> <br />entrance until the site is permanently stabilized. <br />10. Extent of removals at connections to existing pavement shall be coordinated in the field with <br />the City prior to any work. Concrete sidewalk removal limits shall be located at a joint. <br />Bituminous pavement should be saw-cut for clean match lines. <br />11. Once the sanitary sewer stub is exposed and location, size, and elevation are field verified, <br />layout and design of service connection must be submitted to City for review and approval <br />prior to construction. <br />12. The Contractor must submit a Site Management Plan prior to work. The plan must outline <br />concrete management, work that will require dewatering, and any other work requiring <br />protective measures to minimize potential for negative environmental impact. <br />13. The Contractor must be required to submit a Traffic Control Plan prior to work. <br />14. The applicant will be required to obtain a General Construction Permit (NPDES) to discharge <br />stormwater associated with construction activity since more than 1 acre will be disturbed. A <br />copy of the permit must be submitted prior to any land disturbing activity. <br />15. The applicant must submit a Maintenance Agreement for all stormwater management structures <br />and facilities, listing the City as a party to Agreement. The agreement should define <br />maintenance responsibilities following completion of project, specify types and frequencies of <br />inspection and maintenance activities, and designate who will conduct inspection and <br />maintenance activities. <br /> <br /> <br />If you have any questions or comments, please contact me to discuss. <br /> <br />Sincerely, <br />Bolton & Menk, Inc. <br /> <br />Robert E. Bean, Jr., P.E. <br />Water Resources Engineer
The URL can be used to link to this page
Your browser does not support the video tag.