Laserfiche WebLink
10. Appropriate traffic and parking signage shall be installed subject to the Orono <br /> staff and City Engineer's review, including required stop signs within the parking <br /> lots and service drive to ensure safe parking areas and pedestrian crossing within <br /> the development. <br /> 11. The landscape areas as shown on the above referenced site plan shall consist of <br /> grass wherever feasible and shall adhere to the above referenced Revised <br /> Landscape Plan dated 2/21/01 in regards to planting species, sizes and locations. <br /> Because the final road design and traffic patterns have not been established the <br /> final landscaping plans shall be submitted with the Preliminary Plan set. All <br /> landscaping shall be conform to the standards established within the RPUD and <br /> B-6 districts. (Must be approved by DSU.) <br /> 12. Monument signs shall be provided at each entrance to the site. The signage <br /> shall be limited to a company name and/or logo and street address on the <br /> monument signs. Final signage plans shall submitted by the applicant and <br /> approved by the City Council. <br /> 13. Final lighting plan shall be subject to City staff approval and shall locate lighting <br /> so as to direct lights away from the adjacent residential neighborhood. <br /> 14. Erosion control shall adhere to "Best Management Practices for Protecting Water <br /> Quality in Urban Areas". All erosion controls as required by the City shall be <br /> in place prior to commencing excavation on the site. Construction limits shall <br /> not permit removal or regrading of mature trees outside of the defined <br /> construction limits. City Engineer shall hold the right to require additional <br /> erosion control measures during construction, as deemed necessary, to ensure <br /> there is no erosion of the finished grades and no sediment is deposited off site <br /> or into stormwater management facilities. <br /> 15. Additional improvements required are burying of power lines and installation of <br /> street lighting that would be character with the street lighting plans along <br /> Highway 12 in cooperation with the City of Long Lake's street lighting program. <br /> Final plans shall be submitted and approved by the City Council. If necessary <br /> the City of Long Lake shall be consulted to comment on the proposed street <br /> Page 6 of 10 <br />