Laserfiche WebLink
0.45 gpd/ftz Absorption area Soil Loading Rate, which gives a mound ratio of 2.7 1 (minimum) <br />(this must match the soil boring log) desired mound ratio 2.7 <br />percent site slope (0-20% range) �5 (% downslope site slope, if different than upslope) <br />16 inches, or 1,3 ft. to Redox or other limiting condition (need at least 12" to be a Type 1) <br />Treatment zone contains inches of 0% soil credit, and =inches of 50% soil credit. Giving a: <br />20 inch, or 1.7 ft. Sand Lift Mound CRITICAL FOR FUTURE CERTIFICATIONS! L! <br />27.0 ft.Total ABSORPTION width (with sand beyond rockbed as follows:) <br />0.0 ft. upslope and sideslope <br />17.0 ft. Downslope <br />Individual slope ratios give BERM widths (topsoil beyond rockbed) of: <br />4:1 upslope ratio 12 ft. upslope berm <br />3:1 sideslope 13 ft. sideslope berms <br />4:1 downslope 21 ft. downslope berm <br />Overall Dimensions: 10.0 1 ft. wide by 12.0 ft. long Rock bed <br />43 ft. wide by 38 ft. long Mound footprint <br />4" inspection pipe <br />f-- 18" cover on top <br />berm 12 <br />1.7 <br />Limftr'ng Condition <br />Clean sand lift <br />----------------- <br />Depth to Limiting <br />AbsorDtion Width <br />berm 1 21 <br />12" cover on sides <br />(6" loamy cap &6" topsoil) <br />27.0 ---- -- I_. .. <br />Note: <br />For O to 1% slopes, Absorption Width is measured from the Bedequally in both directions. <br />For slopes >1 %, Absorption Wdth is measured downhill from the upslope edge of the Bed. <br />Rock Bed: <br />10.0 ft. by 12.0 ft. by inches under pipe, plus 20% gives =yd' or *1.4= ®ton <br />Mound Sand: (note: volume is based on 3:114:1 slope from top of rockbed, Exchange sand for loamy cap if desired) <br />13.2 up + 27.9 downslope + 11,1 ends + 8.5 under rock = 73 yd' or *1.4= 102 ton <br />plus 20% <br />Loamy Cap: <br />39 ft. by 34 ft. 6" deep, plus 20% gives <br />Topsoil: <br />43 ft, by 38 ft. 6" deep, plus 20% gives <br />I hereby certify that I have completed this work in accordance <br />Designer Signature <br />30 yd' or *1.4= 42 ton <br />37 yd' or *1.4= 52 ton <br />all applicable ordinances, rules and laws. <br />Rusty olson's Soil it Perc 810 <br />Company License# <br />11/12/2018 <br />nate <br />