Laserfiche WebLink
Installer Summary <br />1500 gallon Septic tank (minimum) Tank options: none <br />oux Larger rank warn muiripie camp/ranks <br />1000 gallon Dose tank (minimum) at 25.00 gpi <br />38 GPM @ 33 ft. of head, Pump required <br />7.4 linch swing on Demand float which translates to roughly 4.7 inches of float tether length <br />if time dosing is required -->F 4.8 minutes ON time Ft ®hours OFF time <br />19 inches from bottom of tank to "pump ON" float, or 12 inches to "timer ON" float <br />22 inches from bottom of tank to "Hi Level Alarm" or 32 inches to "Hi level alarm" if time dosed <br />200 ft. of 2.0 inch supply line with end feed manifold connection <br />(Tip: "top feed" manifold to control drainback) <br />20 inch, or 1.7 ft. Sand Lift Mound <br />10.0 ft. wide by 12.0 ft. long Rock bed <br />3 laterals 2.00 inch diameter 10.0 ft. long 3.0 ft. lateral spacing <br />1/4" inch perfs 3.0 ft. perforation spacing <br />No Effluent filter Ft alarm <br />3 clean out 8t valve box assemblies <br />27.0 ft.Total sand ABSORPTION width (minimum) <br />0.0 ft. upslope and sideslope (sand beyond rockbed, minimum) <br />17.0 ft. Downslope (sand beyond rockbed, minimum) <br />Specific slope ratios give BERM widths (topsoil beyond rockbed) of: <br />4:1 upslope ratio 12 ft. upslope berm <br />3:1 sideslope 1 13 Ift. sideslope berms <br />4:1 downslope 1 21 ft. downslope berm <br />4" inspection pipe <br />18" cover on top <br />UDS100e berm 12 _1 � 1 _ nnurncinnc knrm <br />12" cover on sides <br />(6" loamy cap & 6" topsoil) <br />1.7 11 dean sand lift <br />1.3 Depth to Limiting <br />i_irntting i~ondition _ "_`4—__- — -u <br />Absorption Width 27.0 <br />Note: <br />For 4 to 1% slopes, Absorption Width is measured from the Bedequally in both directions. <br />For slopes >1`Yo, Ahsorption 1Hidthis measured downhill from the upslope edge of the Bed. <br />Rock Bed: 4.0 yd3 or *1.4= 6 ton <br />Mound Sand: 73 yd or *1.4= 102 ton <br />Loamy Cap: 30 yd or *1.4= 42 ton <br />Topsoil: 37 yd or *1.4= 52 ton <br />6 inches under pipe <br />calculation based on 3:1/4.-1 slope from top of rockbet <br />6" deep <br />6" deep <br />