Laserfiche WebLink
t <br /> Xcel Energy' <br /> 414 Nicollet Mall <br /> NEEPONEI/LE BY NATURE", <br /> Minneapolis, Minnesota 5 5401-1 993 <br /> April 15 2013 <br /> VIA ELECTRONIC FILING <br /> Dr. Burl W. Haar <br /> Executive Secretary <br /> Minnesota Public Utilities Commission <br /> 350 Metro Square Building <br /> 121 Seventh Place East <br /> St. Paul,MN 55101 <br /> Re: Summary of complaints for March <br /> Orono Substation Replacement and New 115 kV Transmission Line Project <br /> Docket No. E002/TL-11-223 <br /> Dear Dr.Haar: <br /> Northern States Power Company,doing business as Xcel Energy,obtained a route permit(dated <br /> April 6, 2012)to relocate approximately 0.2 miles of Xcel Energy Line 0831,to construct <br /> approximately 0.4 miles of new double-circuit 115 kV transmission line between line 0831 and <br /> the Orono Substation and to expand and modify the Orono Substation to accommodate the new <br /> 115 kV transmission line. The Complaint Procedures for High Voltage Transmission Lines <br /> attached to the route permit require that Xcel Energy submit a summary of all complaints <br /> received or resolved concerning Permit conditions for the project by the 15th of each month. <br /> One landowner concern was received by the Department of Commerce and forwarded to Xcel <br /> Energy regarding this project during the month of March. <br /> Please contact me at 612-330-6073 or ellen.l.heine@xcelenergy.com if there are any questions <br /> regarding this filing. <br /> Sincerely, <br /> Ellen Heine <br /> Compliance and Permitting Analyst <br /> cc: Susanne Steinhauer,MN Department of Commerce Energy Facilities permitting <br />