My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Excel & Minnesota Department of Commerence
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3960 Sixth Ave N - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Excel Energy 2012-2013/Correspondence & MN Dept of Commerce - Mike Gaffron File Cabinet 1
>
Excel & Minnesota Department of Commerence
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:46 PM
Creation date
9/29/2021 10:33:46 AM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
one structure and shifts a portion of the alignment off of the Huntington Farm Home Owners' <br /> Association property and onto Xcel Energy's property near the substation. By eliminating two <br /> jogs shown in the preliminary alignment attached to the route permit, Xcel Energy was able to <br /> eliminate one foundation from a wetland and maximize spanning of wetlands consistent with <br /> Section 4.2.8 of the Route Permit. The structure types and dimensions are consistent with the <br /> structures identified in Section 2.3 of the Route Permit. <br /> Although this alignment modification should have been specifically identified in the Plan and <br /> Profile filings, EFP staff believes that this modification is consistent with the permit and the <br /> information included in the March 22, 2013, filing completes the record pursuant to Sections 3.1 <br /> and 4.1 of the Route Permit. EFP staff has advised Xcel Energy of their responsibility to <br /> indicate any adjustments from the alignment shown in the route permit in their Plan and Profile. <br /> The filing meets applicable permit conditions: X Yes n No n Partially <br /> Permit condition requires an action by the — <br /> Commission: Yes X No <br /> EFP suggests filing be brought to the Commission ❑ Yes X No <br /> for decision: — <br /> Response letter to permittee is recommended: ❑ Yes X No <br /> Suzanne Lamb Steinhauer April 12, 2013 <br /> Energy Facility Permitting Project Manager Date <br /> MN Dept of Commerce <br />
The URL can be used to link to this page
Your browser does not support the video tag.