Laserfiche WebLink
0.60 gpd/ft2 Absorption area Soil Loading Rate, which gives a mound ratio of2 (minimum) <br />(this must match the soil boring log) desired mound ratio 2.0 <br />=percent site slope (0-20% range) =(% downslope site slope, if different than upslope) <br />i8 inches, or 1.5 ft. to Redox or other Limiting condition (need at least 12" to be a Type 1) <br />Treatment zone contains F 0inches of 0% soil credit, and =inches of 50% soil credit. Giving a: <br />18 inch, or 1.5 ft. Sand Lift Mound CRITICAL FOR FUTURE CERTIFICATIONS!!! <br />7) 20.0 ft.Total ABSORPTION width (with sand beyond rockbed as follows:) <br />8) pio-Rt. <br />t. upslope and sideslope <br />Downslope <br />Individual slope ratios give BERM widths (topsoil beyond rockbed) of: <br />�) MclownsLope <br />upslope ratio lift. <br />ft. upslope berm <br />sidesLope ft. sidesLope berms <br />1) downslope berm <br />Overall Dimensions: 10.0 ft. wide by 63.0 ft. long Rock bed <br />39 ft. wide by 1 85 1 ft. long Mound footprint <br />4" inspection pipe <br />i 8" cover on top <br />Upslope berm 12 .1 1 n1AtA1RCIl\la harm. / <br />12" cover on sides <br />(6" loamy cap & 6" topsoil) <br />1.5 Cle7sandlift__1.5 Dep <br />L rr tting Condition — — — — --_-- <br />Absorption WidthT207.0----] <br />20.0 w_ _z_—]----------_ <br />Note: <br />For 0 to 1% slopes, Absorption Wfdtb is measured from the Bedequally in both directions. <br />For slopes 319, Absorption Width is measured downhill from the upslope edge of the Bed. <br />Rock Bed: <br />10.0 ft. by 63.0 ft, by inches under pipe, plus 20% gives =yd' or *1.4= =ton <br />Mound Sand: (note: volume is based on 3:1/4:1 slope from top of rockbed, Exchange sand for loamy cap if desired) <br />31.8 up + F50.8 downslope + 8.7 ends + 38.5 under rock = 15b yd' or *1,4= 218 ton <br />plus 20% <br />Loamy Cap: <br />35 ft. by =ft. 6" deep, plus 20% gives 63 yd' or *1.4= 8$ ton <br />Topsoil.: <br />39 ft. by F85 ft. 6" deep, plus 20% gives 74 yd' or *1.4= F1-047 ton <br />I hereby ce/rt�f' y that I have completed this work in accordance with all applicable ordinances, rules and laws. <br />Rusty Olson"s Soil li Perc 810 10/11/2017 <br />Signature Company License# Date <br />