Laserfiche WebLink
I <br /> I <br /> 4.2.2 Local Governments <br /> During construction,the Permitee shall minimize any disruption to public services orI <br /> public utilities. To the extent disruptions to public services occur,these would be <br /> temporary and the Permitee will work to restore service promptly. Where any impacts to <br /> utilities have the potential to occur, Permitee will work with both landowners and local <br /> agencies to determine the most appropriate pole placement. <br /> The Permittee shall cooperate with county and city road authorities to develop <br /> I <br /> appropriate signage and traffic management during construction. <br /> 4.2.3 Cleanup <br /> I <br /> All waste and scrap that is the product of construc ' sh, 1 be removed from the area and <br /> properly disposed of upon completion of each tas ' t.onal itter, including bottles, I cans, and paper from construction activities shall be + o + on a daily basis. <br /> 4.2.4 Noise <br /> Construction and routine maintenan,, .. ies w be limited to daytime working hours, <br /> as defined in Minn. R. 7030.020 a "'q e nighttime noise level standards will not be <br /> exceeded. <br /> 4.2.5 Vegetation Removal in the Right-of-Way <br /> The Permittee shall minimize die number of trees to be remo ed in selecting the right-of- , <br /> way specifically preserving to the maximu,i xtent prao cable windbreaks, shelterbelts, <br /> living snow fences and areas such as,trail cr. *ngsiltd the Lake Country Scenic By- <br /> Way,where vcgctative screening may .i < thetic impacts,to the extent that suchI <br /> actions do not violate sound engineering inciples or system reliability criteria. <br /> As part of construction, low growing b or tree species are allowable within and at the I <br /> outer limits of the easement area ree species that endanger the safe and reliable <br /> operation of the transmission facility need to be removed. To the extent practical, low <br /> growing vegetation that will not pose a threat to the transmission facility or impede <br /> I <br /> construction should remain in the easement area. <br /> 4.2.6 Aesthetics I <br /> The Permittee will consider input pertaining to visual impacts from landowners or land <br /> management agencies prior to final location of structures,rights-of-way, and other areas <br /> I <br /> with the potential for visual disturbance. Care will be used to preserve the natural <br /> landscape and prevent any unnecessary destruction of the natural surroundings in the <br /> vicinity of the project during construction and maintenance. <br /> I <br /> I <br /> November 2010 Page I 10 I <br /> I <br />