Laserfiche WebLink
of Commerce and Xcel Energy agreed to further extend the comment period by an <br /> additional 25 days so as to allow comment on Xcel Energy's noise assessment study.6 <br /> Eight comments were received before 4:30 p.m. on Tuesday, January 31 , 2012.' <br /> The Commission will issue an order on the application following a review of this <br /> Summary, the hearing transcripts and the filings submitted into the hearing record. <br /> Description of the Project <br /> The Project, as proposed by the Applicant, would replace the existing 69 kV <br /> Orono Substation with a new 115 kV Substation at the same location. The Project <br /> would connect the new substation to the existing Xcel Energy 115 kV transmission line <br /> through a new set of double-circuited 115 kV transmission lines. The Project, as <br /> proposed, would also remove approximately 1 ,030 feet of 115 kV transmission line and <br /> replace it with approximately 1,100 feet of new single circuit 115 kV transmission line. <br /> While not part of the Route Permit requested by Xcel Energy, approximately 400 feet of <br /> the existing Great River Energy 69 kV transmission line would be rerouted around the <br /> new Orono Substation.8 <br /> Xcel Energy proposes to use steel single-pole structures with spans of <br /> approximately 300 to 500 feet between poles. The structure heights of these poles are <br /> anticipated to range between 70 to 90 feet for the single-circuit structures and between <br /> 75 to 115 feet for the double-circuit structures. Xcel Energy requested a route width of <br /> approximately 400 feet, or 200 feet either side of the proposed alignment. The <br /> anticipated right-of-way for the new transmission line would be 75 feet.9 <br /> The Project is located entirely within the city of Orono in Hennepin County. The <br /> Project will cost approximately $5.3 million dollars.19 <br /> Procedural History <br /> On June 7, 2011, Xcel Energy filed its application for an HVTL Route Permit and <br /> approval of the proposed Orono Substation replacement." <br /> On December 2, 2011 , the OES issued a Notice of Public Hearing giving <br /> advance notice of the public hearing to parties on the service list, interested persons, <br /> 6 Notice of Comment Period, OAH 8-2500-22429-2 at 1 (E-Docket No. 20121-70260-01). <br /> See, Hearing Transcript, OAH 8-2500-22429-2 at 2 (E-Docket No. 20121-69850-01). <br /> 8 Order, MPUC Docket No. E-002/TL-11-223, supra. <br /> 9 Id. <br /> 10 Id. <br /> 11 Application, MPUC Docket No. E-002/TL-11-223 (E-Docket No. 20116-63311-01). <br /> 2 <br />