My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EQB & MN Rules
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3960 Sixth Ave N - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel Substation 2011-2012 - File Cabinet 1
>
EQB & MN Rules
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:45 PM
Creation date
9/27/2021 11:51:38 AM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Xcel Energy- <br /> 414 Nicollet Mall <br /> Minneapolis, Minnesota 55401-1993 <br /> j q/ <br /> September 25, 2012 Q. _A it, r v <br /> Michael Gaffron <br /> Assistant City Administrator <br /> Long Term Strategy <br /> City of Orono <br /> PO Box 66 <br /> Crystal Bay, MN 55323 <br /> RE: Xcel Energy Orono Substation Replacement and New Transmission Line <br /> Connection (Minnesota Public Utilities Commission Docket E002/TL-11-223) <br /> Dear Michael, <br /> Northern States Power Company, d/b/a Xcel Energy obtained a Route Permit for construction of a <br /> high-voltage transmission line and associated facilities from the Minnesota Public Utilities <br /> Commission (MNPUC) on April 6, 2012. The Route Permit authorizes Xcel Energy to construct a <br /> new 115kV transmission line between Xcel Energy Line 0831 and the Orono Substation, and to <br /> expand and modify the Orono Substation. <br /> Special Conditions listed in Section 5.3 of the Route Permit required Xcel Energy to allow the <br /> Commission, the city of Orono, the Huntington Farm Home Owners' Association (HFHOA) and <br /> local landowners to review and provide comments on the substation design including the location <br /> and dimension of proposed berms and vegetation around the replacement substation. As a result of <br /> the review and comments from all parties as well as extensive collaboration with the HFHOA, Xcel <br /> Energy provided a final design of the replacement substation including details of a new earth berm <br /> to be constructed and several new trees and shrubs to be planted on Xcel Energy property and a <br /> portion of Outlot A; Lot 1, Block 9 and Lot 1, Block 8 of Huntington Farms. <br /> Final plans for the substation design were submitted to the MNPUC on August 15, 2012 and Xcel <br /> Energy has secured temporary construction rights from the HFHOA and two other individual <br /> landowners as needed to construct the berm and install new landscaping. Construction of the berm <br /> is expected to commence in early October 2012 while installation of trees and shrubs is anticipated <br /> to begin in the spring of 2013. <br /> Per our recent discussions, Xcel Energy requests that the City of Orono accept and grant written <br /> approval of the construction of a new berm, removal of vegetation and the installation of trees and <br /> shrubs by Xcel Energy on a portion of Outlot A, Huntington Farms as they relate to the existing <br /> easements held by the city. Specifically these are the "Flowage and Conservation Easement and <br /> Waiver of Damages" (document No. 5153932) and the "Open Space Easement" (document No. <br /> 5153933)both as filed with the Hennepin County Recorder on September 8, 1986. <br />
The URL can be used to link to this page
Your browser does not support the video tag.