Laserfiche WebLink
Xcel Energy- <br /> 414 Nicollet Mall <br /> Minneapolis, Minnesota 55401-1993 <br /> j q/ <br /> September 25, 2012 Q. _A it, r v <br /> Michael Gaffron <br /> Assistant City Administrator <br /> Long Term Strategy <br /> City of Orono <br /> PO Box 66 <br /> Crystal Bay, MN 55323 <br /> RE: Xcel Energy Orono Substation Replacement and New Transmission Line <br /> Connection (Minnesota Public Utilities Commission Docket E002/TL-11-223) <br /> Dear Michael, <br /> Northern States Power Company, d/b/a Xcel Energy obtained a Route Permit for construction of a <br /> high-voltage transmission line and associated facilities from the Minnesota Public Utilities <br /> Commission (MNPUC) on April 6, 2012. The Route Permit authorizes Xcel Energy to construct a <br /> new 115kV transmission line between Xcel Energy Line 0831 and the Orono Substation, and to <br /> expand and modify the Orono Substation. <br /> Special Conditions listed in Section 5.3 of the Route Permit required Xcel Energy to allow the <br /> Commission, the city of Orono, the Huntington Farm Home Owners' Association (HFHOA) and <br /> local landowners to review and provide comments on the substation design including the location <br /> and dimension of proposed berms and vegetation around the replacement substation. As a result of <br /> the review and comments from all parties as well as extensive collaboration with the HFHOA, Xcel <br /> Energy provided a final design of the replacement substation including details of a new earth berm <br /> to be constructed and several new trees and shrubs to be planted on Xcel Energy property and a <br /> portion of Outlot A; Lot 1, Block 9 and Lot 1, Block 8 of Huntington Farms. <br /> Final plans for the substation design were submitted to the MNPUC on August 15, 2012 and Xcel <br /> Energy has secured temporary construction rights from the HFHOA and two other individual <br /> landowners as needed to construct the berm and install new landscaping. Construction of the berm <br /> is expected to commence in early October 2012 while installation of trees and shrubs is anticipated <br /> to begin in the spring of 2013. <br /> Per our recent discussions, Xcel Energy requests that the City of Orono accept and grant written <br /> approval of the construction of a new berm, removal of vegetation and the installation of trees and <br /> shrubs by Xcel Energy on a portion of Outlot A, Huntington Farms as they relate to the existing <br /> easements held by the city. Specifically these are the "Flowage and Conservation Easement and <br /> Waiver of Damages" (document No. 5153932) and the "Open Space Easement" (document No. <br /> 5153933)both as filed with the Hennepin County Recorder on September 8, 1986. <br />