Laserfiche WebLink
the Permit Application for Wireline Crossing or Longitudinal to place the new structures at least five <br />feet from the existing BNSF railroad right -of way. <br />8.4 Required Permits and Approvals <br />The following Table 15 identifies federal, state, and local permits and approvals that could <br />potentially be required for the Project. <br />Table 15 <br />Potential Required Permits <br />jurisdiction • <br />Permit Requirement <br />Federal <br />USACE, Clean Water <br />Required if dredging and filling activities will occur within jurisdictional <br />Act, Section 404 <br />wetlands. If the proposed activities are not eligible for coverage under the <br />Permit <br />General Permit or Letter of Permission, an Individual Permit will be <br />obtained from the USACE. <br />State <br />Commission, Route <br />Required for any transmission line of 100 kV or greater and greater than <br />Permit <br />1,500 feet in length. <br />MnDNR, License to <br />Required if any work is necessary in public waters. <br />Cross Public Lands <br />and Waters <br />MnDOT, Utility <br />Required to place utilities on Minnesota trunk highway right-of-way. <br />Permit <br />MPCA, NPDES/SDS <br />Required under the NPDES/SDS General Stormwater Permit for <br />General Stormwater <br />Construction Activity where construction activities will cause more than <br />Permit for <br />one acre of ground disturbance. <br />Construction Activity <br />MPCA, Section 401 <br />Required if the USACE requires an individual permit for wetland dredging <br />Water Quality <br />and filling activities. <br />Certification <br />Orono Project June 7, 2011 <br />MPUC Docket No. E002/TL-11-223 69 <br />