My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Orono_Route_Permit_Application - Docket # W002/TL-11-223
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3960 Sixth Ave N - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel 2011 - File Cabinet 1
>
Orono_Route_Permit_Application - Docket # W002/TL-11-223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:47 PM
Creation date
9/27/2021 10:59:10 AM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
species, land use maps) and applicable guidelines, rules, and regulations, a summary of which is <br />provided in Section 8.1 above. Xcel Energy will continue to communicate with these agencies <br />throughout the permitting process. <br />As discussed in Section 4.2.2, Xcel Energy initially sought local review of the Project from the City <br />of Orono. On August 20, 2010, Xcel Energy applied for a CUP from the City pursuant to Minn. <br />Stat. 216E.05, subd. 1(a), and MN Rule 7850.5300 subp. 1. On December 13, 2010, the Orono City <br />Council voted to refer review and permitting of the routing and siting of the Project to the <br />Commission pursuant to Minn. Stat. 216E.05, subd. 1(b), and MN Rule 7850.5300 subp. 4. <br />The following summarizes the several meetings Xcel Energy has participated in during the route <br />development and initial permitting processes. <br />• City of Orono Planning Commission meeting on September 20, 2010; <br />• Meeting with Three Rivers Park District on November 1, 2010; <br />• City of Orono City Council meeting on December 13, 2010; <br />• Meetings with surrounding landowners on various dates; and <br />• Meeting with BNSF on March 17, 2011. <br />Comments from the public are included in Appendix D.2. In general, public comments have been <br />related to the following; a concern that the proposed Project will decrease property values of homes <br />within the HFA, EMF risks, environmental issues and mosquito control. Additionally, many of the <br />HFA home owners commented to the City of Orono on their preference that the City maintain <br />local review of the project and not refer it back to the Commission. <br />Xcel Energy has been working with the City, various agencies, and landowners to establish an <br />acceptable route that results in the least impacts practicable on current infrastructure, residences, and <br />future development. <br />On several occasions last winter and spring of 2011 Xcel Energy met or corresponded with the two <br />landowners who own residences where existing Line 0831 crosses their respective properties. The <br />parties discussed options for routing the new proposed 115 kV transmission line that would connect <br />to Line 0831, and the possibility of moving existing Line 0831 from their properties onto adjacent <br />HFA land. At this time, the parties are working toward an agreement to move existing Line 0831 <br />from these properties and re-routing Line 0831 on HFA property which parallels the BNSF railroad <br />right-of-way. Xcel Energy is also working with representatives of HFA concerning this matter. <br />Xcel Energy also met with the landowner west and adjacent to the existing substation site regarding <br />replacement of the substation, placement of transmission structures, site grading and vegetation. <br />Xcel Energy will continue to work with this landowner. <br />Xcel Energy also corresponded and met with BNSF representatives concerning placement of the <br />new 115 kV transmission structures and conductors at least five feet from existing BNSF railroad <br />right-of-way. On May 9, 2011, Xcel Energy submitted to BNSF an "Application for Wireline <br />Crossing or Longitudinal' for the proposed transmission line. On June 2, 2011, BNSF approved <br />Orono Project June 7, 2011 <br />MPUC Docket No. E002/TL-11-223 68 <br />
The URL can be used to link to this page
Your browser does not support the video tag.