Laserfiche WebLink
jurisdiction and <br />RequirementPermit <br />Hennepin County <br />Culvert <br />Required if extending/connecting culverts. (Sometimes also referred to as <br />Extension/Connectio <br />an Entrance Permit.) <br />n <br />Driveway Permit <br />Required for any changes proposed to driveway access or driveway <br />widening along county highways, including field driveways, residential <br />driveways, commercial driveways and public street access. (Sometimes <br />also referred to as an Access Permit.) <br />Moving Permit <br />Required whenever legal dimensions and/or axle weights are exceeded per <br />(Hauling) <br />county regulations. <br />Oversize/ Overweight <br />Required on all county highways. May be required to move over -width <br />Vehicle Permit <br />loads on county, township, or city roads. <br />Utility Permit <br />Required for work proposed in the county highway rights-of-way. Work <br />requiring this permit includes installation and repair of telephone cables, <br />power lines, gas lines, storm sewers, sanitary sewers, water mains, ditch <br />grading, culvert installation, etc. <br />Wetland Permit <br />Required for activities in wetlands, if needed. <br />Working in the Right- <br />Required if constructing on, across, or under the right-of-way of a county <br />of -Way Permit <br />highway. <br />For the other permits listed in Table 15 above, and any additional permit requirements identified <br />during subsequent agency consultations, Xcel Energy will acquire the necessary authorizations and <br />develop the appropriate plans associated with any permit or authorization (e.g., stormwater pollution <br />prevention management plan prior to construction. <br />Orono Project June 7, 2011 <br />MPUC Docket No. E002/TL-11-223 70 <br />