My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Orono_Route_Permit_Application - Docket # W002/TL-11-223
Orono
>
Property Files
>
Street Address
>
6
>
6th Avenue North
>
3960 6th Avenue North - 29-118-23-33-0009
>
Land Use
>
3960 CR 6 Excel substation
>
Xcel 2011 - File Cabinet 1
>
Orono_Route_Permit_Application - Docket # W002/TL-11-223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:47 PM
Creation date
9/27/2021 10:59:10 AM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Land Use
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, December 13, 2010 <br />7:00 o'clock p.m. <br />(12. #10-3486 XCEL ENERGY, 3960 SIXTHA VENUE NORTH, Continued) <br />Cox stated it would be essentially a 15-20 mile perimeter around the substation. The existing line is at <br />capacity and does not have full protection because it does not have a shield wire. The I I5kV line would <br />provide for better voltage support, superior reliability and protection. Currently there is only one source <br />of power to the area and with the upgrade, if one side of the service goes down, the other side would be <br />able to provide power, which increases the reliability of the system. <br />Mayor White asked what noise level is generated. <br />Sedarski stated they do monitor the noise as part of the EA process and Xcel will be providing those <br />numbers. <br />Dassel asked why this project would not require a full environmental impact statement. <br />Sedarski stated this process is not part of the environmental quality board where the environment <br />assessment is used to determine whether an environmental impact statement is required. Xcel is <br />requesting permitting from the City and the City has 60 days to decide whether to accept the application. <br />In the environmental assessment there is information on the wetlands, and Xcel will review all the <br />impacts and do whatever mitigation is necessary. Xcel follows certain construction techniques that are <br />designed to minimize the impact to the wetlands and would do the construction during the winter. <br />Dassel noted impacts can also be felt outside the wetlands, such as runoff. <br />Sedarski indicated the environmental assessment will provide the design. <br />McMillan asked what the PUC process would entail. <br />Sedarski stated the process before the PUC would involve a similar process as the City's except for an <br />environmental assessment being completed. Xcel would still hold a public meeting with the residents, <br />which is not required under the PUC rules. Once application is filed, it typically takes six to eight months <br />with the PUC. The PUC offers two options for review. The ultimate review process with the PUC does <br />not require Xcel to look at alternate routes but the full permitting process does, which is the only <br />difference between the two processes. <br />McMillan asked why this project does not require the full permitting process. <br />Sedarski indicated the voltage and the distance determines which process should be followed. <br />Mayor White closed the public hearing at 9:23 p.m. <br />Mayor White commented that in his view the City does not have the expertise or established criteria to <br />handle this type of application. <br />McMillan indicated she is in agreement with Mayor White. <br />Murphy stated he is sympathetic to the concerns of the residents, but that in his view it would take a lot of <br />time and energy on the part of the City to deal with this application and that Xcel will probably get what <br />Page 18 of 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.